Similar Projects
2020 Surface Treatment
Results
Less than $1,121,000 est. value

Water Activated Cold Patch
Term Contract
Results

2021 Plant Mix
Results
Less than $3,661,000 est. value

2020 Slurry Seal
Results
Less than $948,000 est. value

Asphalt Patching Services-Petersburg
Term Contract
Results

Paving Installation, Maintenance, and Repair Fort Lee, Virginia
Post-Bid
$5,000,000 to $15,000,000 est. value
Fort Lee, VA

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Smart Scale - Intersection Improvement
Results
VA

2020 Plant Mix
Results
Less than $4,365,000 est. value

2021 Surface Treatment
Results
Less than $1,712,000 est. value

SGR - 2021 Plant Mix
Results
Less than $6,326,000 est. value
VA

2020 Plant Mix
Results
Less than $948,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

2021 Slurry Seal
Results
Less than $862,000 est. value

2021 Plant Mix
Results
Less than $2,400,000 est. value

Last Updated 03/26/2021 09:50 AM
Project Title

Lee Avenue Gate - VA ST LEE AVE GATE

Physical Address View project details and contacts
City, State (County) Fort Lee, VA   (Prince George County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Lee Avenue Gate Project VA ST LEE AVE GATE: project consists of the construction of an extended right turn deceleration lane and ramp entrance into the Fort Lee, Lee Avenue Gate Visitor Center to serve as a controlled access point and vehicle storage for vehicles entering the Fort. In addition, an acceleration lane will be constructed from Lee Avenue to Route 36 (Oaklawn Boulevard) eastbound. Additional work will be pavement demolition of the old right turn ramp and minor configuration of the Lee Avenue entrance at the intersection with Route 36, and minor improvements along Lee Avenue to the Army Access Control Point (ACP). Work will include new curb, pedestrian ramp crossings, new signalization improvements at the intersection, gate control at the right turn ramp and intersection, drainage, storm water management, accommodation of relocation of utilities by the utility owner, and other miscellaneous work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents