Similar Projects
Donora Sewer Rehabilitation Project
Post-Bid
Donora, PA 15033

Lower Yoder Sanitary/Storm Sewer Separation Project Phase III
Post-Bid
Johnstown, PA 15901

Twin Oaks Storm Sewer Piping Project
Results
Gettysburg, PA

2019 Blairsville Highway Turn Back Project Old Main Street and South Liberty Street
Results
Blairsville, PA

Whitebirch Road Extension
New Construction
Construction
Hazle Township, PA 18201

Cast Iron Frames and Grates
Post-Bid
Greensburg, PA 15601

Sanitary Sewer Manhole Rehabilitation Contract
Results
Less than $931,000 est. value
Pittsburgh, PA

Storm Structures for Rain Garden
Post-Bid
Allentown, PA

Brookwood/Park Terrace Stormwater Bmp Project
Results
Paxtang, PA

Parkview Storm Sewer Replacement
Post-Bid
Bellwood, PA 16617

Stormwater Improvements 18th, Vine, and Beech Streets
Results
New Florence, PA

2020-21 Waste Water and Stormwater Products
Term Contract
Post-Bid
Mechanicsburg, PA 17050

Repair the Storm Water Piping at North Allegheny Senior High School
Results
Wexford, PA

Bayard Street Storm Sewer Separation Phase 3 and 4
Post-Bid
Elizabeth, PA 15037

2019 South Avenue Area Sewer Rehabilitation Project - PH
Results
$450,000 to $500,000 est. value
Wilkinsburg, PA

Last Updated 06/23/2020 09:51 AM
Project Title

2020 Storm Sewer Repair and Rehabilitation

Physical Address View project details and contacts
City, State (County) Warrington, PA 18976   (Bucks County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves improvements to existing storm drainage facilities within Warrington Village and The Fairways Sections in Warrington Township. The work to be performed under this Contract includes the replacement of various quantities of 15", 24", 30", and 36" CMP with HDPE pipe and the replacement of CMP. All construction will occur within Township roads and rights-of-way and will involve restoration of pavement and unimproved areas, and provision for all erosion and sedimentation control. In addition to the Base Contract work, the Township will consider potential Alternate/Add-On items that may be included, generally consisting of repairs of 18", 21", 36" and 42" CMP and the replacement of 75 linear feet of 18" CMP and 72 linear feet of 21" CMP with HDPE.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents