Similar Projects
Roadway Improvements for Project Dumpling
Post-Bid
Lancaster, SC 29720

Resurfacing City Streets
Post-Bid
$130,000 to $150,000 est. value
Laurens, SC

Pineland Road Paving Repairs
Results
$163,650 est. value
Newberry, SC 29108

Lonesome Pine Lane Improvement Project
Results
Less than $300,760 est. value
Abbeville, SC 29646

Wildewood Subdivision Paving
Post-Bid
SC

Track and Field Improvements - Phase I
Term Contract
Results
Less than $2,527,000 est. value
Loris, Murrells Inlet, Myrtle Beach, SC 29579

Transportation Improvements
Post-Bid
Anderson, SC 29625

Calhoun County CTC Road Improvement Project
Results
Less than $223,019 est. value
Fort Motte, SC 29135

Grier Street Road Improvements
Post-Bid
Sumter, SC 29150

Clemson University Roadway Maintenance
Results
$110,000 to $140,000 est. value
Clemson, SC 29634

Hot Asphalt C-Fund (West Of 95)
Post-Bid
Orangeburg, SC 29115

Marion County Inaccessible Roads
Results
Less than $125,202 est. value
Marion, SC

Hot Asphalt C-Fund (East of 95)
Post-Bid
Orangeburg, SC 29115

Market Street Improvements Project
Results
$572,736 est. value
Anderson, SC 29625

Marion County Roads Damaged by Flooding
Results
Less than $1,380,368 est. value
Marion, SC 29571

Last Updated 11/10/2021 02:25 AM
Project Title

Reconstruction/Rehabilitation

Physical Address View project details and contacts
City, State (County) SC   (Pickens County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal of Existing Pavement 150.000 Sy Borrow Excavation 3,786.000 Cy Excavation for Shoulder Paving 209.088 Sta Hauling of Excavated Shoulder Material 209.088 Sta Cement Modified Recycled Base (12" Unif)-curing Method B 217,571.000 Sy Portland Cement for Cement Modified Recycled Base Course 8,703.000 Ton Maintenance Stone 484.000 Ton Hma Shoulder Widening Course 1,393.920 Ton Liquid Asphalt Binder Pg64-22 2,863.539 Ton Full Depth Asph. Pav. Patching 8" Unif 13,400.000 Sy Milling Existing Asphalt Pavement 1.75" 5,937.000 Sy Milling Existing Asphalt Pavement 2.0" 199,885.000 Sy Milling Existing Asphalt Pavement (Variable) 775.000 Sy Milled-in Rumble Strip 29.280 Mi Hot Mix Asphalt Surface Course Type B 24,915.233 Ton Hot Mix Asphalt Surface Course Type C 21,953.840 Ton Driveway Paving-surface Type C 1,264.800 Ton Permanent Construction Signs (Ground Mounted) 5,040.000 Sf 4" White Broken Lines -(Gaps Excluded)-fast Dry Paint 52,020.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 420,635.000 Lf 8"White Solid Lines(Crosswalk&channelization)fast Dry Paint 16,896.000 Lf 24" White Solid Lines (Stop/diagonal Lines)-fast Dry Paint 8,111.000 Lf White Single Arrow (Left, Straight, Right)-fast Dry Paint 108.000 Ea White Word Message "Only"-fast Dry Paint 6.000 Ea White Lane Drop Arrow (Left or Right)-fast Dry Paint 10.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 19,240.000 Lf 4"Yellow Solid Line(Pvt.edge&no Passing Zone)-fast Dry Paint 726,190.000 Lf 6" Yellow Solid Line on Curb/median - Fast Dry Paint 600.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 180.000 Lf 4" White Broken Lines(Gaps Excl.)thermoplastic- 90 Mil. 13,220.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 214,119.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 8,448.000 Lf 12in X 18in White Triang. Yield Bar (Gaps Exc)thermo-125mil 18.000 Lf 24" White Solid Lines (Stop/diag Lines)-thermo.-125 Mil 4,048.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 54.000 Ea White Word Message "Only" -thermoplastic - 125 Mil. 3.000 Ea White Word Message "Stop Ahead" -thermoplastic - 125 Mil. 1.000 Ea White Word Message "School" -thermoplastic - 125 Mil. 1.000 Ea White Lane Drop Arrow(Lt.or Rt.)thermo-125mil 5.000 Ea 4" Yellow Broken Lines(Gaps Exc)thermoplastic - 90 Mil. 5,040.000 Lf 4" Yellow Solid Lines(Pvt.edge Lines) Thermo-90 Mil. 200,033.000 Lf 24" Yellow Solid Lines - Thermoplastic - 125 Mil. 90.000 Lf Permanent Clear Pavement Markers- Mono-dir.- 4"X4" 903.000 Ea Permanent Yellow Pavement Markers Mono-dir.- 4"X 4" Perm. Yel. 64.000 Ea Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 1,267.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 1,470.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 26,390.000 Lf Furnish & Install Flush Mounted Wireless Sensor 6.000 Ea Sawcut for Loop Detector 9,590.000 Lf F&i-13"X24"X18"D.elec.flush Undgrd.enclos-(Str.poly.conc.)hd 21.000 Ea Temporary Adjustment of Traffic Signal Equipment 6.000 Ea Detectable Warning Material 75.000 Sf Pedestrian Ramp Construction 150.000 Sy Surface Applied Detectable Warning 150.000 Sf Remove & Dispose Semi-rigid Gr Device 2,650.000 Lf Premash Reset W-beam Strong Post System 9,205.000 Lf Premash Reset Trail W-beam Type B 12.5' 5.000 Ea Premash Type T Tl3 Leading 50' 65.000 Ea Permanent Grassing for Non-permitted Resurfacing Projects 19.710 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents