Similar Projects
Parkview Gardens IV
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Caledonia, WI 53108

Parkview Gardens IV
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Caledonia, WI 53108

Case High School 2020 Bond - Racine Unified School District
Build-out, Infrastructure
Design
$31,268,754 CJ est. value
Racine, WI 53403

Knapp Elementary School - 2020 Bond - Racine Unified School District
Infrastructure, Renovation
Design
$201,000 CJ est. value
Racine, WI 53403

RFP Engineering - Perpetuation - Resurfacing
Infrastructure
Bidding
$2,000,000 CJ est. value
Union Grove, WI 53182

RFP Engineering - Perpetuation - Resurfacing
Infrastructure
Bidding
$2,000,000 CJ est. value
Union Grove, WI 53182

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

2022 Assessable Streets and Alleys
Infrastructure
Post-Bid
$2,000,000 est. value
Racine, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

42-Inch Transmission Water Main Phase 3
Results
$7,500,000 est. value
Racine, WI 53403

Buildings 1 and 2 of the Waterford Lofts Project
New Construction, Infrastructure
Construction
$11,000,000 CJ est. value
Waterford, WI 53185

W. 6th Street, Bridge Over Root River, P-51-0709
Infrastructure
Construction
$6,734,483 CJ est. value
Racine, WI 53404

Washington Avenue Multi-Family
Demolition, New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Racine, WI 53403

Washington Avenue Multi-Family
Demolition, New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Racine, WI 53403

Highway 20 Water Main - West Boulevard to Marquette (Department Of Transportation) - City of Racine
Infrastructure
Conception
$1,000,000 CJ est. value
Racine, WI 53403

Last Updated 02/03/2023 01:37 PM
Project Title

Milldrum Street Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Union Grove, WI 53182   (Racine County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,488,808 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed construction consists of the reconstruction of Milldrum Street from 17th Avenue to 18th Avenue with water main replacement and new installation, replacement of storm sewer and force main and sanitary sewer, and other miscellaneous items of work. All Bids must be accompanied by a Bidder's bond, certified check, bank cashier's check or bank draft payable to the Village of Union Grove for five percent (5%) of the total amount of the Bid as provided in the Bidder Instructions. Est. Completion Date: Sept. 15, 2023

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents