Similar Projects
HVAC filters
Term Contract
Design
Baton Rouge, LA 70802

HEPA Filtration Air Purifiers -Statewide
Term Contract
Bidding
Baton Rouge, LA 70802

Caminada Back Barrier Marsh Creation Vegetative Planting Lafourche and Jefferson Parish
Term Contract
Sub-Bidding
Baton Rouge, LA 70802

Two (2) Year Elevator Maintenance Contract for The Jefferson Parish
Term Contract
Sub-Bidding
Baton Rouge, LA 70802

Disaster Grant Management Service
Alteration
Post-Bid
Baton Rouge, LA

Aerial Spraying for DOC/PE
Term Contract
Post-Bid
LA

Concrete
Term Contract
Sub-Bidding
Baton Rouge, LA 70802

Janitorial Services, Pest/Rodent Control, and Grounds Maintenance Services - 81St Readiness Division Facilities Throughout Louisiana
Term Contract
Post-Bid
Baton Rouge, Bossier City, Lafayette, Lake Charles, New Orleans, LA 70802

Window Washing Library Branches and Outreach Facility
Term Contract
Post-Bid
Baton Rouge, LA 70806

Annual Parishwide Homeowners Sewage Pump Installation and Maintenance Project
Term Contract
Post-Bid
Baton Rouge, LA 70802

Pressure Washing and Power Sweeping of Louisiana State University Parking Garages Term Contract
Term Contract
Post-Bid
Baton Rouge, LA 70810

Grounds Maintenance Services BREC Parks
Term Contract
Post-Bid
Baton Rouge, LA 70802

Shelter - DPS - Rebid
Term Contract
Post-Bid
Baton Rouge, LA 70802

Junk Trash and Debris Removal Services Group D
Term Contract
Post-Bid
Baton Rouge, LA 70802

Field Marking Paint - Term Contract Rebid
Term Contract
Post-Bid
Baton Rouge, LA 70802

Last Updated 01/12/2023 02:08 AM
Project Title

DOTD HP Asphaltic Mix F/Cold Application

Physical Address View project details and contacts
City, State (County) Baton Rouge, LA 70802   (East Baton Rouge County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes labor, materials, and services required to produce Asphaltic Mixture for Cold Application, High Performance, which is acceptable to the Department of Transportation and Development. Contract is for a six (6) month period beginning January 16, 2023 or upon award and ending June 30, 2023 for the Department's various Districts in the State as requested in accordance with provisions set forth as specified herein. All Asphaltic Mixture for Cold Application, Type HP (High Performance) furnished under this contract must be in accordance with DOTD Specification No. MS 164-003, Revised 3/10/22 and an approved product listed on the Approved Materials List (AML) for High Performance Cold Mix for Patch Matl. The contractor accepts the following guarantees: (1) Guarantee that the supplies delivered are free from defects in design and construction. (2) Guarantee that the supplies are the manufacturer's standard design in construction and that no changes or substitutions have been made in the items listed in this contract. The Contractor holds and saves the State, its officers, agents, and employees harmless from liability of any kind, including cost and expenses on account of any patented or unpatented invention, articles, devices or appliances manufactured or used in the performance of this contract, including use by the government. The Contractor agrees to replace free of charge all defective equipment, materials or supplies delivered under this contract. All transportation charges covering return and replacement shall be paid by the contractor.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents