Similar Projects
Roberts Road Improvements
Results
$630,757 est. value
Fairfax, VA

Columbia Drive Restoration
Results
VA

Massanetta Springs Road (SR 687) Improvement Project
Results
$2,177,572 est. value
Harrisonburg, VA 22802

Pickett Shopping Center Roadway Improvements Project
Results
$262,153 est. value
Fairfax, VA 22030

Hope Drive Extension
Results
$2,772,000 est. value
Winchester, VA 22601

Smart Scale Intersection Improvements
Results
Less than $4,111,000 est. value
VA

Y--Hidden Pond Trail Resurfacing
Results
Lorton, VA 22079

Full Depth Reclamation and Asphalt Resurfacing
Results
Blacksburg, VA

Hurricane Evacuation Services Peninsula
Term Contract
Results
Hampton, Newport News, VA

Lee Avenue Gate - VA ST LEE AVE GATE
Results
$1,000,000 to $5,000,000 est. value
Fort Lee, VA

Route 28 Widening
Results
$86,748,000 est. value
VA

King George County Middle School Turn Lane
Results
King George, VA

Asphalt Paving Term Contract
Term Contract
Results
Suffolk, VA 23434

Paving
Term Contract
Results
Front Royal, VA 22630

Prince William Parkway Interchange at Realigned Balls Ford Road
Results
$145,000,000 est. value
Prince William, VA 22192

Last Updated 12/28/2020 10:30 AM
Project Title

NOAA Wallops Road Repair

Physical Address View project details and contacts
City, State (County) Wallops Island, VA 23337   (Accomack County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

NOAA Wallops Road Repair: Project includes subject-expert assessment of existing paving, design of all require repair, construction of the portion of repair designated as Phase I, and all related management, supervision, inspection, and overhead. Preliminary opinion of repair needs includes: - 13 meter-A antenna pad, 1600 sq.yd. - Road intersection to 13 meter-A antenna pad, 1442 sq.yd. - 13 meter-B antenna pad, 1600 sq. yd. - Road intersection to 13 meter-B antenna pad, 533 sq. yd. - Road intersection to HR-1 antenna, 712 sq. yd. - Road HR-1 antenna to HR-2 antenna, 356 sq. yd. - Guard house road incoming and outgoing, 339 sq. yd. - Route 175 gate road incoming and outgoing and turnaround, 8022 sq. yd. - Concrete road east of the Maintenance Building, leveling, 389 sq. yd. - Intersection south of Operations Building Addition, widening, 111 sq. yd.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents