Similar Projects
Reported | 09/24/2020 12:00 AM |
Project Title | Dam Inspection - Brewster Pond |
Physical Address | View project details and contacts |
City, State (County) | Stratford, CT 06615 (Fairfield County) |
Category(s) | Professional Services |
Sub-Category(s) | Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Complete a Statement of Proposed Compliance with Inspection Requirements for submittal to CT DEEP. 2. Perform an inspection of the dam and appurtenances, review available existing data, observe upstream and downstream conditions, evaluate the overall condition of the dam, evaluate the Town’s O&M procedures, perform an analysis and assessment of the hydrologic and hydraulic capacities and the structural stability of the dam. 3. Prepare a report of the inspections, condition and hydraulic capacity including: • Recommendation for any emergency measures needed to assure the immediate safety of the dam; • Recommendations for remedial measures (engineered repairs); • Recommendations for additional detailed studies, investigations and analyses, if required; • Recommendations for time frames for the above recommendations; • Recommendations for routine maintenance (non-engineered) and inspection by the Town. 4. Prepare an Emergency Action Plan in full accordance with the CT DEEP regulations and guidelines. This shall include Dam monitoring procedures, Notification Flow chart, Warning notification procedures, Inundation mapping in NAVD88, and Drill procedures |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |