Similar Projects
Last Updated | 09/21/2022 04:33 PM |
Project Title | Lakeview Drive Force Main Extension |
Physical Address | View project details and contacts |
City, State (County) | Crossville, TN 38555 (Cumberland County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,200,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project generally consists of the installation of approximately 8,150 linear feet of 8-inch DR-21 PVC sanitary sewer force main and related appurtenances between the Lake Catherine Pump Station and Westchester Drive. Construction is contingent upon permit approval from TDEC Division of Water Resources. A certified check or cashier's check payable to the Owner or a satisfactory Bid Bond executed by a corporate surety licensed under the laws of Tennessee to execute such Bonds in the amount equal to five percent (5%) of the total of the Bid shall be submitted with each Bid. Attention is called to the fact that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. The Owner reserves the right to reject any and all Bids, to waive informalities, or to reject non-conforming, non-responsive, or conditional bids. The Owner reserves the right to award a contract to the lowest, responsive, responsible bidder or bidders, taking into consideration quality, performance and time. The Bid deposit shall be retained by the Owner if the successful Bidder fails to execute the Contract or fails to provide the required Bonds, as stated above, within ten (10) days after award of the Contract. The successful Bidder shall be required to furnish separate one hundred percent (100%) Performance and Payment Bonds. The Performance Bond shall be in full force and effect for one (1) year after the date of final acceptance of the project by the OWNER. Each Bidder shall be responsible for the review of all addenda for the project and shall acknowledge the addenda on the bid form. Each Bidder must be appropriately licensed as a Contractor in the State of Tennessee as provided in T.C.A. Title 62 Chapter 6. The Bidder's name, license number, expiration date, and that part of the contracting classification applying to the Bid shall appear on the sealed envelope containing the Bid; otherwise, the Bid shall not be opened. Est. Value Notes: 1.0 - 1.2 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |