Similar Projects
Shoreline 189 Multifamily Development
New Construction
Conception
Shoreline, WA 98133

East Lake Apartments
New Construction - 34,986 SF
Conception
Seattle, WA 98101

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Results
WA

Douglas Truth Branch Library Access Improvements
Renovation, Infrastructure, Alteration - 18,848 SF
Results
$450,000 to $500,000 est. value
Seattle, WA 98122

21st Avenue Townhomes
New Construction - 11,064 SF
Construction
$75,000 est. value
Seattle, WA 98122

Heron Rowhomes
New Construction - 7,755 SF
Construction
$1,000,000 to $5,000,000 est. value
Seattle, WA 98117

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

3138 Wetmore Avenue South Apartments
New Construction - 10,094 SF
Conception
Seattle, WA 98144

Last Updated 03/21/2023 10:34 AM
Project Title

18th Avenue East Apartment Building

Physical Address View project details and contacts
City, State (County) Seattle, WA 98112   (King County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope details have not been released. As of March 21, 2023, a building permit is pending corrections with the City of Seattle. The project is currently on hold due to high construction costs. Information regarding the general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before late 2023.

Details

5 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents