Similar Projects
Grayson Parking Lot
New Construction - 1,200 SF
Conception
Pittsburgh, PA 15219

Chatham University - Shadyside Campus - Connect Campus Character to 5th Avenue
Renovation
Design
Pittsburgh, PA 15232

Design activities limited to: Concrete curb ramps, radio communication system
Infrastructure
Bidding
$2,500,000 to $4,999,999 est. value
Mount Oliver, Pittsburgh, PA

2022 Restoration of Various Streets
Infrastructure
Bidding
South Park Township, PA

Handicapped Curb Explosion
Post-Bid
Carnegie, PA 15106

J099--Asphalt Road Repair Pittsburgh Veterans Affairs Medical Center
Post-Bid
Pittsburgh, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Lowering of SR 2058 (Hulton Road)
Results
PA

Mill & Overlay of Borough Roads
Infrastructure - 153,000 SF
Bidding
West View, PA

Parking Lot Improvements at Airside Business Park
Post-Bid
Pittsburgh, PA 15231

2020 Paving Project
Results
Cheswick, PA 15024

Asphalt Resurfacing
Infrastructure
Bidding
PA

2020 ADA Ramp Project -Borough of Heidelberg
Post-Bid
Heidelberg, PA 15106

Parking Lot Repaving
Results
Less than $657,280 est. value
Homestead, PA 15120

2022 Road and Alley Resurfacing Project
Infrastructure
Bidding
$450,000 est. value
Dormont, PA 15216

Reported 02/05/2022 12:00 AM
Project Title

South Busway Rehabilitation

Physical Address View project details and contacts
City, State (County) PA   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Project includes, but is not limited to, the furnishing of all labor, materials, tools, equipment and incidentals for the rehabilitation for approximately 1.6 miles of the South Busway from the South Bank Station to the Pioneer Avenue Ramp. The existing busway concrete pavement will be crack and seated, and overlayed with seven and a half (7.5) inches of bituminous Superpave pavement, except on bridge structures or otherwise noted. The project also includes replacement of all concrete curb and guide rail, repair of concrete barrier, drainage improvements, pavement markings, maintenance and protection of traffic, and curb cut ramp upgrades at stations. Additionally, Work also includes a new ADA accessible ramp and concrete repairs at the Edgebrook Avenue Stop, repairs and restoration of Whited Street, Edgebrook Avenue, and Norfolk & Western Railroad Bridges, full painting of the Norfolk and Western Railroad Bridge, and modifications at the intersection of the South Busway and Glenbury Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents