Similar Projects
Oxford Drive Water Main and Drainage Improvements
Bidding
Bradenton, FL 34205

Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

FY19 Seawall Restoration at Marina Drive - 56th Street
Post-Bid
$160,000 est. value
Holmes Beach, FL

North River Ranch Phases 1B and 1D East
Results
Sarasota, FL 34230

Misc Concrete and Drainage Repairs
Results
Less than $240,271 est. value

Lake Bank Repairs
Post-Bid
FL

Clean and Reshape Ditches
Results
Less than $196,561 est. value

Manatee High School Safety Improvements (North)
Post-Bid
Bradenton, FL 34201

Shore Protection Project, Anna Maria Island, Beach Renourishment 2020, Manatee County, Florida
Results
$15,000,000 to $25,000,000 est. value
Anna Maria, FL

Presidio and Riviera Drainage Improvements
Post-Bid
Lakewood Ranch, FL 34202

Lido Key Hurricane and Storm Damage Reduction Project
Results
$10,000,000 to $25,000,000 est. value
Sarasota, FL

Presidio and Riviera Drainage Improvements, CDD5
Post-Bid
Lakewood Ranch, FL

Oak Street Drainage Improvements Braden River Watershed Oak Street from Hubbel Road to Pin Street
Results
$375,000 to $382,000 est. value
Bradenton, FL 34206

Coquina Channel Seagrass Mitigation Project
Post-Bid
$400,000 est. value
Bradenton Beach, FL

Miscellaneous Concrete and Drainage
Results
Less than $240,271 est. value

Reported 03/17/2020 12:00 AM
Project Title

FY19 Seawall Restoration at Marina Drive - 67th Street

Physical Address View project details and contacts
City, State (County) Holmes Beach, FL   (Manatee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $160,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of removing a 22 linear foot portion of seawall cap in an area where 18 linear feet of existing seawall has failed along 67th. The contractor will then install 21 linear feet of new vinyl seawall wall no more than 18 inches waterward of the existing seawall and repour a 22 linear foot concrete cap.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents