Similar Projects
South Hartford Conveyance and Storage Tunnel - Tunnel Pump Station Contract No. 3
New Construction
Bidding
Hartford, CT

Woodruff Hill Sanitary Sewage Pump Station at E. Commerce Drive
New Construction
Bidding
Oxford, CT

Provision and Installation of a Prefabricated Pump Station
Post-Bid
Groton, CT 06340

Construction of Stormwater Pumping Station, Stratford, CT
Post-Bid
$5,000,000 to $10,000,000 est. value
Stratford, CT

WPCF Plant and Pump Station Fiber Connection Installation
Results
$50,000 to $130,000 est. value
Plainville, CT

Pump Stations Resiliency Implementation
Results
New Haven, CT

Plantsville Pump Station Rehabilitation Project
Renovation
Post-Bid
$825,000 est. value
Southington, CT 06489

Wastewater Pump Stations Rehabilitation Project
Renovation
Results
Stafford, CT 06615

Evergreen Avenue Sewer Pump Station Supply and Installation of Fourth Pump
Infrastructure
Post-Bid
Waterford, CT 06385

James Street Siphon Station Upgrades Project
Results
New Haven, CT 06512

Riverdale Farms Sanitary Sewer Pump Station Upgrades
Renovation
Post-Bid
Avon, CT 06001

Easton Turnpike Pump Station and Force Main Replacement
Results
Fairfield, CT 06824

Woodbridge Lane, Ridgewood Acres and Woodbridge Lane Pump Station Reconstruction Project
Renovation
Results
$1,000,000 to $2,499,999 est. value
Thomaston, CT 06787

Steele Street Pump Station Modifications
Renovation
Results
Less than $443,700 est. value
New Britain, CT

Route 133 Pump Station Improvements
Results
Brookfield, CT

Last Updated 08/10/2021 08:34 AM
Project Title

Water Pollution Control Authority Phase I Pump Station Upgrades

Physical Address View project details and contacts
City, State (County) Hebron, CT 06248   (Tolland County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,200,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work involves comprehensive upgrades to four (4) sanitary pump stations and also installing new emergency generators atfour (4) other sanitary pump stations. Pump stations are located in Hebron, CT. The Work includes the construction of new structures and buildings, the renovation of existing structures,providing site piping, process equipment,instrumentation, mechanical, and electrical systems, completing site work improvement, and the demolition of existing equipment, structures, and systems.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents