Similar Projects
Culvert Replacement
Bidding
Less than $464,822 est. value
Northwood, NH

Roxbury Street Flood Improvements
Bidding
Less than $1,860,000 est. value
Keene, NH 03431

Major Road and Embankment Repairs and Reconstruction Stemming
Post-Bid
Orange, NH

Soil Stabilization and Sealing
Post-Bid
Concord, NH 03302

Rehabilitate A 48 X 144 Long Corrugated Metal Pipe
Results
Less than $269,920 est. value
Bow, NH 03304

Libby Museum Shoreline Restoration
Results
Wolfeboro, NH

Septic and Floor Drain Line Services
Bidding

Bio-Swales and Bioretention Installation
New Construction
Post-Bid
Meredith, NH

Spruce Avenue Culvert Repairs over Dinsmore Brook
Results
$55,000 to $75,000 est. value
Bartlett, NH

Wasserman Park Beach Restoration Project
Post-Bid
Merrimack, NH

Sculptured Rocks Road Culvert Project
Results
Groton, NH

Winter Drive Drainage Improvements Project
Results
Hooksett, NH

Rudsboro Road Improvements-Bank Stabilization Project
Results
Less than $78,000 est. value
Lebanon, NH

2019-2020 Highway Department Items - High Density Polyethylene Culvert Pipe
Term Contract
Results
Pelham, NH

West Duston Road Area Water, Sewer and Drainage Improvements
Results
Less than $2,200,000 est. value
Salem, NH

Last Updated 03/31/2020 10:59 AM
Project Title

Beach Grading at Hampton Beach State Park

Physical Address View project details and contacts
City, State (County) Hampton, NH 03842   (Rockingham County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Over the course of the winter. sand from Hampton Beach has been redistributed by wind and wave action so that large volumes of sand have been piled up against the concrete seawall that runs the length of the beach. This project involves re-grading the sand away from the seawall to the low tide line Over the length Of Hampton Beach, and removing sand out of the staiwells. The start date for the Project will be April 20, 2020 and the completion date will be no later than 12:00 pm on May 8, 2020.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents