Similar Projects
Habitat for Humanity Homes
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Macon, GA 31201

SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

I-95 at SR 25 and I-95 Sb and Nb at Ogeechee River - Bridge Rehab
Infrastructure
Design
$3,000,000 CJ est. value
Ellabell, GA 31308

I-95 at SR 25 and I-95 Sb and Nb at Ogeechee River - Bridge Rehab
Infrastructure
Design
$3,000,000 CJ est. value
Ellabell, GA 31308

Construction of 2022 Waynesboro LMIG
Infrastructure
Bidding
Waynesboro, GA

RFP Engineering - Max Lockwood Drive
Infrastructure
Bidding
$300,000 CJ est. value
Statesboro, GA 30458

FY2022 LMIG - Widening of Old Alma-Waycross Highway
Infrastructure
Post-Bid
GA

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

2021 Resurfacing And Roadway Improvement Project
Infrastructure
Results
$615,687 est. value
Metter, GA

Road Resurfacing SPLOST VII 2021
Infrastructure
Results
GA

Dogwood Plaza / Adairsville
New Construction, Infrastructure - 7,260 SF
Construction
$1,500,000 CJ est. value
Adairsville, GA 30103

Murphy USA #7172/7850 / Baxley
New Construction, Infrastructure - 1,300 SF
Construction
$1,500,000 CJ est. value
Baxley, GA 31513

Venus Solar Power Plant
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Macon, GA 31201

Mavis Tire Center - Bass Road Mixed-Use Development Parcel C
New Construction, Infrastructure - 6,950 SF
Pending Verification
$1,500,000 CJ est. value
Macon, GA 31210

Rocky Creek Sewer Lines and the Riverside Basin Sewer Project - Macon Water Authorit
Infrastructure
Conception
$28,000,000 CJ est. value
Macon, GA 31201

Last Updated 04/25/2023 04:11 PM
Project Title

Corporate/ Maintenance Hangar

Physical Address View project details and contacts
City, State (County) Alma, GA 31510   (Bacon County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Aircraft Hangar, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Due to funding project was not awarded. Unsure if/when project will rebid at this time. Proposed project is to construct a new 100'x100' Corporate/Maintenance Hangar with attached 30'x100' Airport Office Building, Parking, and general site improvements. Prospective bidders should read the following instructions carefully before submitting their bids. For each item on the bid form there is a space provided for the price to be shown in numerals and words. All notations must be in ink. Totals read at the opening of bids are not guaranteed to be correct and no final award of contract will be made until the bid and extensions have been verified. A Bidder's bond must be executed on the form furnished by the Owner, and the required bond, cash, cashier's check, or certified check must accompany each proposal, in the amount of 5% of the total amount of the proposal. A 100% performance bond and a 100% payment bond will be required of the Contractor at time of contract execution. A Georgia Resident Agent must countersign all bonds from a surety company authorized by law to do business in this State pursuant to a current certificate of authority to transact surety business by the Commissioner of Insurance; no bond shall be approved unless the surety is on the United States Department of Treasury's list of approved bond sureties. The successful bidder will be required to provide the Owner with the affidavit required by OCGA 36-91-21 (e) Competitive Award Requirements. All work under the contract shall be completed within three-hundred sixty (360) calendar days from the issuance of the notice to proceed. Liquidated damages for delays in completion will be in $750 per calendar day. Payment will be made monthly on completed work. Retainage will be held by the Owner to a maximum of ten percent (10%) of each progress payment. THE RIGHT TO REJECT ANY OR ALL BIDS AND TO WAIVE INFORMALITIES IS RESERVED TO THE OWNER.

Details

10,000 SF.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents