Similar Projects
Septic Tank, Grease Trap, Lift Station and Sewage Hauling Services County Wide
Term Contract
Post-Bid
Viera, FL 32940

Brevard County Utility Services Department Underground Utility Contractor Services Fiscal Year (FY) 2020
Term Contract
Results
Viera, FL 32940

Greenboro Forcemain Replacement Project
Results
$649,000 est. value
West Melbourne, FL 32904

259 and 263 North Courtenay Parkway 4" Sewer Lateral Repair
Results
Merritt Island, FL 32953

Desilt and Video
Results
Less than $175,000 est. value
FL

Sykes Creek Zone North Force Main Extension
Results
$372,265 to $721,607 est. value
Viera, FL 32940

Continuous Contract for Water, Wastewater and Stormwater Repairs for Emergency Work
Term Contract
Results
Melbourne, FL 32901

General Contractor - Utility Systems
Term Contract
Results
Cocoa, FL 32922

North Courtenay Parkway Force Main and Reuse Extension, Phase 3
Results
$1,219,042 est. value
Merritt Island, FL 32953

Coastal Lane to Columbia Lane Forcemain Project
Results
West Melbourne, FL 32904

Lift Station B-20 Gravity Line Replacement
Results
Indian Harbour Beach, FL 32937

Desilt and Video and Pipe Lining
Results
Less than $600,000 est. value

Merritt Island Gravity Line Repairs
Results
Merritt Island, FL 32952

South Central Viera Force Main Extension
Results
Melbourne, FL 32940

Tulip Avenue Utility Improvements
Results
Cocoa Beach, FL 32931

Last Updated 10/29/2020 03:39 PM
Project Title

Fred Poppe Regional Park Septic to Sewer Conversion

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32907   (Brevard County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $359,717
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the conversion of five (5) separate existing septic systems to be abandoned and connected to a new gravity sewer system. This includes the Scout pavilions, dog park, the baseball fields, the softball fields and the soccer fields. Approximately 3,336 lf of sewer line will be installed and connected to an existing and a proposed lift station for pumping into the existing force main that connects to the City of Palm Bay sewer system.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents