Similar Projects
Reunion Ridge Filing 2 and 3 Improvements
Infrastructure
Bidding
$11,000,000 est. value
Commerce City, CO

First Creek Interceptor Segments 1B, 1C, 1D Bid Package 1
Infrastructure, Alteration
Bidding
$19,665,000 to $21,700,000 est. value
Aurora, CO

Lyons Valley River Park Ponds Water Quality Improvement Project
Post-Bid
Lyons, CO

2021 Road and Drainage Project
Post-Bid
Gunnison, CO

PKAA, West Sopris Coal Refuse Project 620E
Results
Less than $1,000,000 est. value
Trinidad, CO

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

Carter Park Drainage Improvements
Post-Bid
Breckenridge, CO 80424

Sky Ranch Phase 2 Grading Project
Results
Lakewood, CO 80033

Culvert Pipe
Post-Bid
CO

Addenbrooke Park Pond Renovations
Results
Lakewood, CO

2021 Red Mountain Road Retaining Wall Repair Project
Post-Bid
Aspen, CO 81612

Regional Pond Rehabilitation
Results
Parker, CO 80134

Flying Horse Pond 1 Retrofit
Infrastructure
Post-Bid
Colorado Springs, CO

Village North Drainage & Infrastructure Improvements Project
Results
Less than $1,747,700 est. value
Castle Rock, CO

Tenmile Intake Structure, Pipeline and Erosion Mitigation Improvements
Infrastructure
Post-Bid
Frisco, CO

Reported 06/17/2022 12:00 AM
Project Title

Taxiway B Embankment (Phase 1 Earthwork)

Physical Address View project details and contacts
City, State (County) Gypsum, CO 81637   (Eagle County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $2,280,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The approximate quantities of major bid items involved in the proposed work are: C-102a Install Sediment Control Logs 480 LF C-102b Install Erosion Control Blankets 8,000 SY C-102c Tied Concrete Block Mat Erosion Control 225 SY P-151a Clearing and Grubbing 13 AC P-152a Embankment 50,000 CY T-901a Seeding with Hydromulch 13 AC

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents