Similar Projects
Bridges and Box Culvert Renovations at Wind Cave National Park
Design
$250,000 to $500,000 est. value
Hot Springs, SD

3/4 Inch Surfacing Gravel
Post-Bid
Huron, SD

SD NPS Pp 2020(1), Pavement Preservation South
Post-Bid
SD

I-29 Exit 73 Interchange Improvement
Results
Less than $800,000 est. value
Tea, SD 57064

Gateway Boulevard (CR106) Phase 2 Improvements
Results
Less than $14,500,000 est. value
Tea, SD 57064

West Ash Avenue CIPP - 2020
Post-Bid
Loomis, SD 57301

2021 Douglas/Washington Streets
Results
Elk Point, SD 57025

Saint Patrick Street Reconstruction
Post-Bid
Rapid City, SD 57701

North Rochford Road and Hanna Road Mill and Asphalt Overlay - Phase 4
Results
$700,020 est. value
Central City, SD 57754

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Union County Road 1B Asphalt Concrete Overlay
Results
$2,774,569 est. value
Elk Point, SD

Paver Patching
Post-Bid
SD

2021 Scheduled Street Repairs
Renovation
Results
$230,225 to $250,000 est. value
Spearfish, SD

Pavement Rehabilitation Project - Rand Road
Post-Bid
Rapid City, SD 57702

Veterans Parkway Improvements
Results
Less than $1,862,212 est. value
Sioux Falls, SD

Last Updated 04/02/2021 04:01 PM
Project Title

Northwest Industrial Park

Physical Address View project details and contacts
City, State (County) Volga, SD   (Brookings County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 to $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing the following: •Furnish and Install approximately 650 LF of 8” Gravity Sewer pipe, manholes along with associated materials for service connections. •Approximately 550 LF 18” RCP Storm Sewer pipe. •Approximately 2,150 LF of 6” Watermain, fittings, fire hydrants, service connections and appurtenances. •Approximately 1,200 feet of new street construction and surfacing consisting of approximately 2,400 CY topsoil removal and placement; 800 CY unclassified excavation; 3,800 Ton of gravel base course; 1,600 Ton of Hot Mix Asphalt Pavement; and 2,400 SY of Geotextile Fabric. •Approximately 2,500 LF of concrete curb and gutter.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents