Similar Projects
Island Creek Berm Repair
Term Contract
Design
$500,000 to $1,000,000 est. value
Clarksville, VA

Concrete Pipe and Structures
Term Contract, Infrastructure
Bidding
Bedford, VA

Concrete Pipe and Structures
Term Contract, Infrastructure
Bidding
Bedford, VA

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Taxiway Z / Taxilane C Infield Drainage Improvements, Dulles Airport
Results
$200,000 to $250,000 est. value
Dulles, VA

Bayberry Subdivision Drainage Improvements - Phase 1
Results
Newport News, VA

Z--COLO 253093 York River Shoreline Stabilization 2B
Post-Bid
$10,000,000 est. value
Yorktown, VA

High Density Polyethylene (HDPE) Pipe Culvert
Results
Fancy Gap, VA 24328

Dry Run Bank Stabilization Project
Infrastructure
Post-Bid
Covington, VA

Almond Creek Interceptor Creek Crossing Replacement and Creek Stabilization
Results
Less than $3,500,000 est. value
Richmond, VA

Scale Pit Wall and Headwall Repairs
Infrastructure
Post-Bid
Petersburg, VA

Path Improvements in the Day Use Area Service Road at Westmoreland Park
Results
Montrose, VA 22520

Nottoway River Reservoir Diffused Aeration System Replacements
Infrastructure
Post-Bid
Blackstone, VA

Polymer Coated Corrugated Metal Pipe - Willis and Check Areas
Results
Check, Willis, VA 24380

Reported 05/12/2022 12:00 AM
Project Title

HDPE Plastic Pipe

Physical Address View project details and contacts
City, State (County) Fincastle, VA   (Botetourt County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description Furnish and deliver Polypropylene (PP) Triple-Walled/ Smooth Lined Pipe and Polyethylene (PE) Double Walled/smooth lined pipe.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents