Similar Projects
Heritage Community Park and Police Department Parking Lot Improvements
Post-Bid
Glenn Heights, TX 75154

Furneaux Creek Trail
Post-Bid
Carrollton, TX 75006

Sidewalk Repairs
Results
University Park, TX 75205

Delaware Creek Trail Connector
Results
$2,161,560 est. value
Irving, TX 75060

2020 Sidewalk and Barrier Free Ramp Improvements at Various Locations Contract
Post-Bid
Dallas, TX 75201

MacArthur Boulevard Trail Construction
Results
$1,300,000 est. value
Coppell, TX 75019

CRWS Maintenance Parking Improvements
Post-Bid
Dallas, TX 75212

Nevill Road Switching Station Grading (GP and L)
Results
$4,700,000 est. value
Garland, TX 75040

Streetscape and Sidewalk Repair
Post-Bid
TX 75200

Concrete Repair of Sidewalks, Utility Cuts, Streets, and Alley
Term Contract
Results
$624,685 est. value
Irving, TX 75060

Lake Highland Trail Improvements
Post-Bid
$1,800,000 est. value
Rowlett, TX

Terminal D Upper, Lower Level Roadway and Sidewalk Expansion Joints Replacement
Results
$12,305,000 est. value
Dallas, TX 75261

2015 Residential Sidewalk Replacement Program Region 4
Results
$873,921 est. value
Richardson, TX 75080

Traffic Signal and Sidewalk Installation
Results
Less than $1,661,892 est. value
TX

Wagging Tail Dog Park - Parking Improvements
Results
$256,793 est. value
Dallas, TX 75248

Last Updated 10/28/2020 02:25 PM
Project Title

Walmart Supercenter #3224-256 - Ogp-Ce

Physical Address View project details and contacts
City, State (County) Garland, TX 75043   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method
Project Status Construction Commenced June 2020, Construction Complete as of July 2020
Bids Due View project details and contacts
Estimated Value $7,161
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

OGP CAPACITY EXPANSION

Details

1 Misc. Structures, 1 Story Above Grade, 850 to 1,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents