Similar Projects
Automated Meter Infrastructure Installation and Implementation Services
Post-Bid
Cuyahoga Falls, OH

2021 Backflow Device Testing Repairs and Inspections
Infrastructure
Post-Bid
Akron, OH

Silver Lake Towers Loop Waterline
Results
Less than $245,505 est. value
Silver Lake, Stow, OH 44224

NSSM Hudson Water Main Replacement
Results
Less than $1,464,697 est. value
Hudson, OH 44236

North Quad Piping Replacement
Infrastructure
Post-Bid
$160,000 est. value
Akron, OH 44304

Water Main Replacement Program 2019
Results
$1,719,930 est. value
Akron, OH

Water Main Replacement 2023 Phase 1 Project - Materials
Infrastructure
Post-Bid
Akron, OH

Lead Service Line Replacement Program 2021
Results
$969,069 est. value
Akron, OH

Water Meter Testing Bench
Infrastructure
Post-Bid
Akron, OH

Beechwood Drive Waterline Extension 2021
Results
$190,000 est. value
Tallmadge, OH 44278

Stow Road Phase V Waterline Replacement
Infrastructure
Results
$700,060 est. value
Stow, OH 44224

Elm-Wetmore Waterline and Storm Sewer Replacement
Infrastructure
Results
Less than $545,335 est. value
Stow, OH

North Oviatt Street Waterline Replacement
Infrastructure
Results
$611,207 est. value
Hudson, OH

Valley View Area - Sanitary and Water Improvements
Infrastructure
Results
Akron, OH 44313

2021 Commodore Cove Water Main Replacement
Infrastructure
Results
$589,521 est. value
Aurora, OH 44202

Last Updated 06/30/2022 11:16 PM
Project Title

Water Main Replacement Program 2022

Physical Address View project details and contacts
City, State (County) Akron, OH 44314   (Summit County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of 14,400 feet of new, 6", 8", 10", 12", and 16" water main installation on 13th Street SW, Albert Place, Avondale Drive, Charlotte Street, Dewitt Drive, Foursome Avenue, Gold Street, Nickel Street, N. Valley Street, Noah Avenue, S. Main Street, Schumacher Avenue, Silver Street, Springfield Center Road, and Sundale Road, including tapping mains, tying into existing mains, service line transfers, service line renewals, fire hydrant installations, all water main fittings and proper asphalt, concrete, curb, and earth restoration.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Distribution Fire Hydrants, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents