Similar Projects
City Municipal Building Retaining Wall Replacement
Infrastructure
Bidding
Lone Tree, CO

Sanitary Sewer Flow Monitoring
Infrastructure
Bidding
Castle Pines, CO

Desert Ridge Place Storm Sewer Reconstruction
Post-Bid
Castle Rock, CO

6" Chase Drain
Infrastructure
Post-Bid
Castle Rock, CO

Castle Rock Troop Office Retaining Wall Repair / Replacement and Lot Drainage
Results
Less than $325,000 est. value
Castle Rock, CO 80109

Spray Lining 4 Culverts and Constructing a Headwall and Wingwall for One Culvert
Results
Less than $1,000,000 est. value

Public Improvements within Phase 2 of The Point Redevelopment Project
Construction

Woodlands Sewer Interceptor Rehabilitation Project - Phase 2
Infrastructure
Post-Bid
CO

Metzler Ranch Pond Retrofit Project
Results
Less than $674,559 est. value
Castle Rock, CO 80104

2022 Annual Backflow Testing and Cross Connection Control Program
Infrastructure
Post-Bid
Highlands Ranch, CO 80126

Regional Pond Rehabilitation
Results
Parker, CO 80134

CR Water Projects
Infrastructure
Post-Bid
Castle Rock, CO

Village North Drainage & Infrastructure Improvements Project
Results
Less than $1,747,700 est. value
Castle Rock, CO

Larkspur Elementary School Site Drainage Improvements
Results
Larkspur, CO 80118

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Last Updated 03/24/2022 03:40 PM
Project Title

Sageport 2018 Local Improvements District (LID) & Bannock 2019 Local Improvement District

Physical Address View project details and contacts
City, State (County) CO   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,696,136
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of grading, water, and sanitary sewer infrastructure, storm sewer infrastructure, aggregate base course, curb & gutter, hot mix asphalt, and erosion control as the major construction items. The Project includes the following major items and approximate quantities: Sageport: " 764 cubic yards of Unclassified Excavation " 1,118 cubic yards of Aggregate Base Course (Class 6) " 1,129 linear feet of 8-inch PVC Sewer Line " 1,559 linear feet of 10-inch PVC Water Line Bannock: " 1,621 cubic yards of Unclassified Excavation " 732 cubic yards of Aggregate Base Course (Class 6) " 958 linear feet of 8-inch PVC Sewer Line " 942 linear feet of 10-inch PVC Water Line

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents