Similar Projects
New Cosmetology Training Center
New Construction - 25,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
SC 29072

Clemson University Memorial Stadium Renovations
New Construction, Renovation
Conception
Clemson, SC 29634

Water Research Facility Renovation
New Construction - 30,000 SF
Design
Pendleton, SC

New Arts and Sciences Building Construction
New Construction - 125,000 SF
Design
Greenville, SC 29607

Building 8, 2 and 6 Renovations
Renovation
Bidding
$2,750,000 to $3,000,000 est. value
Beaufort, SC 29902

Elevator Preventative Maintenance and Repair Services
Term Contract
Bidding
Spartanburg, SC 29303

E-Gaming Room Renovations
Post-Bid
Less than $50,000 est. value
Cheraw, SC

TOC-Midlands-General Construction Services
Post-Bid
Columbia, SC

Lehotsky Hall Renovation
Renovation - 94,000 SF
Results
Less than $19,000,000 est. value
Clemson, SC

Restroom Renovations
Renovation
Results
$600,000 to $850,000 est. value
Pendleton, SC

Fulp Hall Fifth Floor Renovation
Renovation
Construction
$1,000,000 to $1,200,000 est. value
Pendleton, SC 29670

USC 707 Catawba Upfit - CAS Art Studios
Construction
$1,500,000 to $2,000,000 est. value
Columbia, SC 29201

The Citadel Masterplan
Renovation
Pending Verification
Charleston, SC 29409

USC Sumter Science Building Renovation II
Renovation - 22,000 SF
Design
$3,500,000 to $4,500,000 est. value
Sumter, SC 29150

UOFSC Upstate Information Resource Center Renovations
Renovation
Post-Bid
$500,000 to $625,000 est. value
Spartanburg, SC 29303

Reported 12/10/2021 12:00 AM
Project Title

1206 Flora Street Operations Budget-Second Floor Architectural Work

Physical Address View project details and contacts
City, State (County) Columbia, SC 29201   (Richland County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $280,000 to $330,000
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work associated with this project includes Architectural work at 1206 Flora including interior walls, ceiling grid and tile, Doors and frames, exterior storefront windows and glazing, and interior finishes.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents