Similar Projects
Last Updated | 05/22/2023 03:34 PM |
Project Title | Charter Schools - Stairway Replacements |
Physical Address | View project details and contacts |
City, State (County) | Pembroke Pines, FL 33028 (Broward County) |
Category(s) | Education |
Sub-Category(s) | Elementary School, Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $525,261 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of May 22, 2023, the award amount is $525,261.45. The City of Pembroke Pines is seeking proposals from qualified firms, hereinafter referred to as the Contractor, to replace metal stairways with concrete stairways at Academic Village charter school, in accordance with the terms, conditions, and specifications contained in this solicitation. The City anticipates on utilizing federal funds for this project, such as the American Rescue Plan Act (ARPA), as a result this project will follow federal procurement guidelines. Questions Due Date: Mar 20th 2023, 1:00 PM EDT Contractors will be required to provide a valid driver's license at the Academic Village Campus and may be required to sign in each of the meetings to show proof of attendance. It is the vendors responsibility to make sure that they sign in at the meeting. A site visit is required prior to submitting a proposal, this would assist the Contractors gain a better understanding of the bid documents, scope of work, and any requirements needed to be considered for the job. Demolition of existing metal stairs to include handrails, guard rails, steps, stairway landings, and any other items required as noted on plans. Removal of any existing soffits and walls noted on plans. Remove any existing light fixtures, cameras, conduit, and any other items under or near stairs that may interfere with construction. All equipment is to be protected for the duration of construction and reconnected after stairs installation in same location as required. Any equipment damaged will need to be replaced with new equipment. All doors, elevators, fixtures, fire sprinklers and any other existing items that remain must be protected through duration of construction. All debris to be removed from site. Jobsite shall be maintained clean through duration of job. Supply and install new cast in place concrete stairway which shall include all labor and material, as noted on plans. Supply and install structural steel required for new stairways, as noted on plans. Supply and install any items such as light fixtures, security cameras, fire alarms, smoke detectors, pa system speakers, and soffits that were removed during demolition, as noted on plans. Supply any repair work needed in all affected areas of construction on walls, floors, ad anywhere else required. Supply and install new aluminum hand and guard rails, as noted on plans. Remove existing fire sprinklers and cap for duration of work. When work is complete reinstall new fire sprinklers in same locations and update accordingly to adhere to building code. Contractor is responsible for verifying all field measurements and conditions. Contractor shall repair areas damaged during construction back to their original state or better. The city intends to complete all stairwells in the campus in one mobilization during the established timeframe, contractor shall provide a lump sum price for all 8 stairwells. Additionally, contractor is to provide a price per stair well type. (Type 1 prototype for buildings S, C and D) & (Type 2 for Building U) in case the city decides to reduce the scope of work to meet budgetary constraints #0-1 Lump Sum Charter Schools – Stairway Replacements-LGI Construction- $255,440.00 #0-2 Type 1 for buildings S, C and D -LGI Construction -$185,400.00 #0-3 Type 2 for Building U -LGI Construction -$70,040.00 |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |