Similar Projects
Little Scholars Academy
Renovation - 2,895 SF
Design
Huntersville, NC 28078

Cross Charlotte Trail - 7th Street to 10th Street Connector
Bidding
$1,736,000 est. value
Charlotte, NC 28206

Long Term 1 Parking Lot Expansion
Post-Bid
Charlotte, NC

1001 Bond Street Parking Lot Addition
Addition
Post-Bid
Charlotte, NC 28208

Sanford Lane Sidewalk Extension
Results
Charlotte, NC

Fire Investigations Pavement Replacement
Results
$415,000 est. value
Charlotte, NC

Lot 20 Revitalization
Post-Bid
Charlotte, NC

Louise Avenue Parking Lot Improvements
Results
$1,890,358 est. value
Charlotte, NC 28204

Mcdowell Creek Greenway Phase II Dana’s Branch
Post-Bid
Less than $2,300,000 est. value
Cornelius, NC 28031

Margaret Wallace Road Sidewalk Project
Results
Less than $452,000 est. value
Charlotte, NC

Little Sugar Creek Greenway
Post-Bid
NC

Yellowstone Zebulon Street Connectivity Project
Results
Less than $1,737,000 est. value
Charlotte, NC

Asphalt and Concrete Repair Services
Post-Bid
Charlotte, NC

Little Sugar Creek Greenway and Stream Enhancement Project, I-485 to Polk Street
Results
Pineville, NC 28134

Peachtree Hills Sidewalks
Post-Bid
$1,137,000 est. value
Charlotte, NC

Reported 05/08/2019 12:00 AM
Project Title

Student Activity Center (SAC) Handicap (HC) Lot Revitalization

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description This project consists of improvements to the existing SAC Handicap Parking Lot (SAC/HC Lot) in order to bring the lot into compliance with current Americans with Disabilities Act (ADA) standards. The base bid improvements include selective demolition, excavation, backfill and compaction, regrading, and repaving as specified in the construction documents. The SAC/HC Lot is located to the north of Belk Gym, and to the west of Barnhardt Student Activities Center on the campus of UNC Charlotte.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents