Similar Projects
216 Spruce Street Water Damage Restoration
Alteration
Bidding
Lumberton, NC 28358

Residential Sound Insulation Program - Phase 8
Alteration
Bidding
Greensboro, NC

Wilson Hall Shower Replacement - - East Winston-Salem State University
Post-Bid
Winston-Salem, NC

Dividing Curtain for Gym
Post-Bid
Kinston, NC 28501

Install Resurface Bathtubs and Install Bathtub Surrounds in 100 Occupied Public Housing Units
Results
Rockingham, NC 28379

Insulation Installation and Repair
Term Contract
Results
Raleigh, NC 27610

Recovering Existing Folding Panel Partition in the Main Hall
Alteration
Bidding
Havelock, NC

DPS - Rockingham Youth Development Center: Storefront and Curtain Wall
Post-Bid
Reidsville, NC 27230

General Construction (FAL)
Term Contract
Results
Raleigh, NC 27610

Appalachian State University Substation Screen Wall At Stansberry Circle
Renovation, Alteration
Bidding
Boone, NC 28607

Rockingham Youth Development - Spray Foam
Post-Bid
Reidsville, NC 27230

Seventy-First High School, Ceiling Replacement
Results
Fayetteville, NC 28306

Ceiling Tile and Grid Replacement at Ed Baldwin Elementary
Post-Bid
Hope Mills, NC 28348

Repair Building Envelope and Interior Finishes, Building 1016
Results
$10,000,000 to $25,000,000 est. value
Cherry Point, NC 28533

L.E.C. 1St Floor Ceiling Tile Replacment
Post-Bid
Fayetteville, NC 28302

Reported 10/13/2021 12:00 AM
Project Title

9-1-1 Emergency Communications Center Glass Partitions

Physical Address View project details and contacts
City, State (County) Morehead City, NC 28557   (Carteret County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work is to • The Contractor shall install tempered glass partitions on top of a total of nine (9) work stations. • The Contractor shall ensure that the framing and glass are mounted in a secure fashion. • Glass shall be approximately 3’ high around all areas. • The Contractor shall verify any and all measurements pertaining to this project. • Moving of all materials, equipment and all cleaning are to be handled by the Contractor.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents