Reported | 06/09/2022 12:00 AM |
Project Title | Transfer Station Revetment Retaining Wall Replacement |
Physical Address | View project details and contacts |
City, State (County) | Cambridge, MA (Middlesex County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $50,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Location # 1 Golden Hill Transfer Station 3270 Golden Hill Road Church Creek, MD 21622 Remove and replace each revetment/retaining wall (one at a time). The new walls shall be constructed using the following materials: (58)- 4X12-16ft piling (22)- 10X16ft piling (7) - 3X6-16ft ... (7) - %" X 2Oft Tie Back Rods (7) - 3/l" X 15ft Tte Back Rods (14) - 2X1 OX16ft Cap Boards (7) - 3X6X16ft Cap Boards 5/8"X18" Stainless Steel Bolts (*Estimated quantities. Contractor is responsible for reviewing project) AU lumber shall be salt treated. All hardware shall be stainless steel. County will provide dumpsters for disposal of materials. County will provide and haul all back fill material. Contractor is responsible for placing and compaction of material. Trash Compactor will be removed by County. Location #2 Secretary Transfer Station 5915 Cambridge Road Route 14 Secretary, MD 21664 Remove and replace each revetment/retaining wall (one at a time ). The new walls shall be constructed using the following materials: (38) - 4X12-16ft piling (14)-10X16ft piling (7)-3X6-16ft ... (5) - %" x 20ft Tie Back Rods ... (5) - 3A" X 15ft Tie Back Rods (4) - 3X6X16ft Cap .Boards (7) - 2X10.X 16ft Cap Boards 5/8"X18" Stainless Steel Bolts (*Estimated quantities. Contractor is responsible for reviewing project) Ail lumber shall be salt treated. All hardware shall be stainless steel. County will provide dumpsters for disposal of materials. County will provide and haul all back fill material. Contractor is responsible for placing and compaction of materi al. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |