Similar Projects
Construction Installation for the Water, Gas, and Wastewater Systems
Infrastructure
Bidding
Lenoir City, TN

Special Line and Tank Cleaning Services
Term Contract
Bidding
Chattanooga, TN

24 Hour Fuel Service Kiosk
Post-Bid
Apison, TN 37302

2021 US 231N Natural Gas Line Extension
Post-Bid
TN

Gas and Sewer Relocations
Results
$300,000 to $425,000 est. value
Pulaski, TN

Sodium Hypochlorite Disinfection System for Wastewater Treatment Plant
Results
Loudon, TN 37774

Fuel Management System Upgrade Base System with Cellular Plan
Post-Bid
Livingston, TN 38570

North College Street Gas Line Replacement
Results
$55,000 est. value
Mount Pleasant, TN 38474

Natural Gas Mains
Term Contract
Post-Bid
Smyrna, TN

Replace Gas Line at Franklin High School
Infrastructure
Results
Franklin, TN 37064

Fuel Pump Replacement
Infrastructure
Post-Bid
Greeneville, TN 37743

Installation-Automatic Read Water and Gas Meter System
Infrastructure
Results
Pulaski, TN

Natural Gas System Expansion
Infrastructure
Post-Bid
Waverly, TN

Repairs on Fuel Dispensing Pumps and Fuel Systems
Term Contract, Infrastructure
Results
Memphis, TN

Self-Fueling System Replacement
Infrastructure
Post-Bid
Greeneville, TN 37745

Last Updated 01/17/2022 12:10 PM
Project Title

Chemical Containment and Tank Installation at Water Pump Station

Physical Address View project details and contacts
City, State (County) Memphis, TN 38134   (Shelby County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and demolish the existing Sodium Hypochlorite and Fluorosilicic Acid bulk tanks and concrete containment area; furnish and install new concrete containment areas; new Sodium Hypochlorite and Fluorosilicic Acid bulk tanks along with all associated valves, piping and fittings

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents