Similar Projects
2.562 Miles of Widening and Reconstruction for Turn Lanes on Jerry Jones Dr/Eager Rd (Cs 1517) Beginning at Baytree Rd And Extending to North Oak St.
Infrastructure
Bidding
GA

Lee Street Lift Station and Associated Improvements
Post-Bid
Valdosta, GA 31601

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Southern Region Disaster Recovery Support BPA
Results

2020 Local Maintenance and Improvement Grant - Road Resurfacing
Results
Less than $849,040 est. value
Valdosta, GA 31603

Widening - Grading, Drainage, Base And Paving
Post-Bid
Valdosta, GA

Clyattstone Road and Simpson Lane- Grading, Base, Paving
Results
Hahira, GA 31632

Hightower Road and Cooper Road NE - Grading, Drainage, Base and Paving
Infrastructure
Post-Bid
Valdosta, GA

8.762 Miles of Milling, Inlay and Plant Mix Resurfacing on SR 125 beginning North of Inner Perimeter Rd and Extending North of Hightower Road (CR 176)
Results
GA

Resurfacing of West Stanfill Street, South Barfield Street and South Newsome Street
Infrastructure
Post-Bid
$152,000 est. value
Hahira, GA 31632

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

LMIG Street Resurfacing
Results
College Park, GA 30337

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

2021 LMIG Project
Results
Mount Vernon, GA

Reported 02/03/2022 11:43 AM
Project Title

Gordon Street at Lamar Street Intersection Improvements

Physical Address View project details and contacts
City, State (County) Valdosta, GA 31601   (Lowndes County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The work consists of installing turn lanes, traffic striping, traffic arrows, traffic control, grassing, erosion control and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents