Similar Projects
Cupola Repairs – Painting And Reconditioning
Renovation
Bidding
Washington, DC 20011

Fencing
Renovation
Bidding
Washington, DC 20011

Owner’s Representative Service for a Building Renovation Project
Renovation
Post-Bid
Washington, DC 20032

General Contractor for a Building Renovation Project
Renovation
Post-Bid
Washington, DC 20001

School Boardroom and Reception Renovations
Renovation
Results
Washington, DC 20001

Pre-Construction & General Contracting Services for Charter School Facilities
Renovation
Results
$130,000 est. value
Washington, DC 20001

Whittle School & Studios
Renovation - 600,000 SF
Construction
Washington, DC 20008

General Contractor- Kitchen Lab Buildout
Renovation
Post-Bid
Washington, DC 20001

School Expansion to Second Campus - Project Manager
Results
Washington, DC 20011

Construction/ General Contractor Services
Post-Bid
Washington, DC 20017

School Expansion to Second Campus - General Contractor
Results
Washington, DC 20011

School Multipurpose Room Renovation - General Contractor
Renovation
Post-Bid
Washington, DC 20017

Construction Project Manager - Public Charter School
Post-Bid
Washington, DC 20012

General Contractor - Public Charter School
Post-Bid
Washington, DC 20012

Design-Build Services for Bard High School Early College
Post-Bid
Washington, DC 20032

Reported 03/28/2020 12:00 AM
Project Title

Design-Build Services - Ferebee Hope Site Development

Physical Address View project details and contacts
City, State (County) Washington, DC 20032   (District of Columbia County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The current development plan for the Property envisions a new 110,000 SF high school with a baseball diamond, a full multisport field with a track, a community garden, a new 20,000 SF community rec center with an adjacent 4,000 SF for partner space, a community basketball court, and adjacent surface parking. The arrangement with both the community and the City is that the existing recreation center cannot be shut down until the new one is open and operational.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents