Similar Projects
2022 Bond - Proposition A - Alvarado ISD
New Construction, Renovation, Infrastructure
Conception
$107,450,000 CJ est. value
Alvarado, TX 76009

2022 Bond - Proposition B - Alvarado ISD
New Construction, Renovation, Infrastructure
Conception
$17,550,000 CJ est. value
Alvarado, TX 76009

Mound Elementary School and Norwood Elementary School Additions and Renovations
Addition, Demolition, New Construction, Renovation, Infrastructure - 63,500 SF
Bidding
$30,000,000 CJ est. value
Burleson, TX 76028

FM 917 - Hazard Elimination and Safety
Infrastructure
Bidding
$4,138,660 CJ est. value
Burleson, TX 76028

SH0174 - Reflectorized Pavement Markings and Markers
Infrastructure
Sub-Bidding
$599,130 CJ est. value
Cleburne, TX 76033

Construction Manager at Risk Services for the Construction of the Wastewater Treatment Plant Expansion Project
Renovation
Post-Bid
$16,100,000 est. value
Alvarado, TX 76009

CDBG Water System Improvements
Infrastructure
Post-Bid
$600,000 est. value
Rio Vista, TX

World-Wide Water Storage Tank Remediation
Term Contract
Results

WWTP Expansion and Reuse Pump Station
Results
$33,000,000 est. value
Cleburne, TX 76033

Godley Retail Center Phase II
New Construction, Infrastructure - 9,980 SF
Pending Verification
$750,000 CJ est. value
Godley, TX 76044

Lavish Nails and Spa
New Construction, Infrastructure - 2,400 SF
Pending Verification
$100,000 CJ est. value
Joshua, TX 76058

FM 917 - Hazard Elimination and Safety
Infrastructure
Bidding
$2,321,531 CJ est. value
Burleson, TX 76028

East Renfro Waterline Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Burleson, TX 76028

CDBG Sewer System Improvements
Renovation
Results
$525,000 est. value
Grandview, TX

Lewis Lane and Hillcrest Street Sewer Line Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Keene, TX 76059

Last Updated 07/26/2022 06:04 PM
Project Title

Pump Station 5 Pressure Tank

Physical Address View project details and contacts
City, State (County) Joshua, TX 76058   (Johnson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of rehabilitating and relocating an existing 12,000-gallon pressure tank. The 12,000-gallon tank is located at Plant #6 and will be relocated approximately 30 miles to Plant #5. Prior to relocating the tank, the interior and exterior of the tank will be sandblasted and recoated per the specifications and bid schedule. The 12,000-gallon tank will replace an existing 5,000-gallon pressure tank located at Plant #5, that will be removed. This project also consists of yard piping, tank saddles, concrete tank supports, and related appurtenances. The Contract Documents, consisting of Advertisement for Bids, Information for Bidders, Bid Proposal, Bid Bond, Agreement, Performance and Payment Bonds, General Conditions, Notice of Award, Notice to Proceed, Plans, and Specifications, may be examined at the following location: JACOB & MARTIN, LLC 1508 Santa Fe Drive, Suite 203, Weatherford, Texas 76086 The Owner reserves the right to waive any informalities and to reject any or all bids. Bids may be held by the Owner for a period not to exceed 30 days from the date of bid opening for the purpose of reviewing the bids and investigating the qualifications of Bidders prior to awarding of the contract.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents