Similar Projects
Finish Site Plan Work for New Marina Office
New Construction, Infrastructure
Conception
$116,643 CJ est. value
Islamorada, FL 33036

Sombrero Beach Sand Renourishment - City of Marathon
Infrastructure
Conception
$416,000 CJ est. value
Marathon, FL 33050

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Terminus Transmission Main Replacement Project
Infrastructure
Bidding
$400,000 CJ est. value
Key West Nas, FL 33040

Fort Zachary Taylor State Park Overflow Parking Project
Infrastructure
Bidding
$447,645 CJ est. value
Key West Naval Air Station, FL 33040

Diesel Pump Upgrades at J. Robert Dean Water Treatment Plant
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Florida City, FL 33034

Fishermen's Community Hospital - Medical Arts Building
New Construction, Infrastructure - 9,990 SF
Post-Bid
$3,000,000 CJ est. value
Marathon, FL 33050

Silicone Joint Sealer
Infrastructure
Results

Founders Park Path Replacement
Infrastructure
Results
$96,440 est. value
Islamorada, FL 33036

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

1319 William Street Residential
New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Key West Nas, FL 33040

Duck Avenue Supportive Housing Development
New Construction, Infrastructure, Renovation
Pending Verification
$40,600,000 CJ est. value
Key West Nas, FL 33040

Duck Avenue Supportive Housing Development
New Construction, Infrastructure, Renovation
Pending Verification
$40,600,000 CJ est. value
Key West Nas, FL 33040

Key West Bight Street Parking - City of Key West
Infrastructure
Conception
$2,210,946 CJ est. value
Key West Nas, FL 33040

Last Updated 09/06/2023 09:37 AM
Project Title

Green Turtle Hammock Nature Preserve Improvements

Physical Address View project details and contacts
City, State (County) Islamorada, FL 33036   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $5,077,870 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A "Cone of Silence"is hereby imposed prohibiting communications in connection with this bid or the Project. The Cone of Silence shall be in effect from the time of issuance of this bid through the time the services or Project procured through this bid are formally awarded through the approval of the Village Council. It is the sole responsibility of proposing firms to ensure that their submittal is received in a timely manner. Any proposal package submitted past the deadline and/or submitted to other locations or offices shall be deemed non-responsive and will be rejected. Duration of Cone of Silence. The Cone of Silence shall terminate upon approval of the contract by the Village Council The successful proposer shall construct a 55 linear foot seawall repair, a 410 square-foot kayak launch, a 165 square-foot boardwalk, and installation of new riprap along 700 square feet of the side of the boat basin, large chunk armor stone along the east side of the boat basin and fill in the uplands to level existing grade elevations. Also contained within the scope is the filling and capping of an existing residential well adjacent to the canal. Questions arising from any site visits must be submitted in writing to mary.swaney@islamorada.fl.us no later than July 28, 2023 and shall be answered through written addenda as provided in Section II of this document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents