Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Post-Bid
Less than $95,000,000 est. value

Design Build Multiple Award Task Order Contract
New Construction
Post-Bid
$500,000 to $10,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Village Park Building Construction - General Site Construction
Construction
$1,500,000 est. value
Lampeter, PA 17537

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Annual Request for Qualifications for future airport-related planning and development projects
Term Contract
Post-Bid

Job Order Contracts (JOC) Region B
New Construction, Renovation
Results
$10,000,000 est. value

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Design
$250,000 to $5,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Northwestern Region Job Order Contracting Services
Term Contract
Results

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Last Updated 08/31/2020 01:48 PM
Project Title

Lancaster Airport Terminal for Alliance Aviation Additions and Renovations

Physical Address View project details and contacts
City, State (County) Lititz, PA 17543   (Lancaster County)
Category(s) Government/Public, Transportation
Sub-Category(s) Airline/Passenger Terminal, Misc. Buildings
Contracting Method
Project Status Construction Nearing Completion
Bids Due View project details and contacts
Estimated Value $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Selective demolition shall include existing exterior entry canopies, miscellaneous interior partitions, mechanical, electrical and plumbing systems and or as indicated on Demolition Drawings. Demolition shall also include the removal of existing paving and chain link fencing as required for the new construction and site improvements. Building Improvements: The work includes renovations to the existing Lancaster Airport Terminal to improve and update the commercial airline customer service area, and to provide a community events venue and conference room. New work shall also include an addition to the existing terminal building, totaling approximately 3,100 additional square feet at the main level; and a 1,200 square feet at the upper level, to accommodate the relocation of Alliance Aviation from its current location on the eastern edge of the airfield. Common Space Improvements to the existing terminal will include: enclosing the existing exterior canopy on the eastern side of the terminal, a frameless glass enclosure, sound soak wall and storage area at the community events space, new commercial airline office spaces, passenger lounge and customer service area. Work in that area will also include preparations for updated TSA equipment, and new finishes throughout. Other work will include: updates to the existing electrical fixtures, plumbing services, and a new mechanical systems throughout, including ductwork piping and controls. This work shall include all partitions, doors, fixtures, fittings, equipment, accessories, and hardware as required for the completion of these spaces. Work shall also include new and/or updated sprinkler system, and installation of all life safety systems, including emergency lighting and exit signs within these spaces as required by Contract Documents and per applicable codes. IV. Alliance Aviation Addition and Improvements: 1. First Floor area work includes: New decorative stairway, and corridor, conference room, passenger lounge, custom customer service counter, customer service representative work area, managers office, prep kitchen, entry vestibule, covered porch, passenger coffee bar, passenger restroom, janitor and storage closet. 2. Second Floor area work includes: New decorative stairway, corridor, private exterior balcony, pilot offices, lounge and an open area pocket office. Work also includes pilot shower and restroom facilities, sleeping rooms, kitchenette, pilot activity area, and mechanical areas. V. Site Improvements include: All site work related to the terminal additional and renovations as shown on the Land Development Drawings prepared by ELA Group and Drawings as prepared by the Architect. That work shall include select removal of existing macadam and the creation of a new bituminous paved parking lot, and entrance drive northwest of the terminal, to be accessed from the existing entry road. The access will include traffic control entry devices to the taxiway, landscaped and hardscaped areas, pedestrian wayfinding bollards and general site lighting. The new entry drive will provide staged rental vehicle parking and direct access for Alliance customers. Other site improvements shall include the relocation of existing storm water systems, erosions and sediment controls, installation of new bluestone sidewalk, stamped paving, containerized site landscaping, installation/relocation of new or existing fencing and furnishings as indicated on Drawings provided by Architect. VI. Exterior building improvements shall include: All work associated with the construction of the new addition, limited window/door replacement and re-siding of the existing terminal, and the construction of new exterior light shelf and welcome signage.

Details

Airline/Passenger Terminal, 4,300 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents