Similar Projects
Bridge Reconstruction Program - 11086 - City of Sioux Falls
Demolition, New Construction, Infrastructure
Conception
$14,585,000 CJ est. value
Sioux Falls, SD 57104

RR Grade Separation, CE
Infrastructure
Conception
$10,000,000 CJ est. value
Sioux Falls, SD 57107

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Corn Palace Renovation
Renovation, Infrastructure
Design
$42,000,000 CJ est. value
Mitchell, SD 57301

Cold Milling and Asphalt Concrete Surfacing - Yankton Area
Infrastructure
Bidding
$4,965,000 CJ est. value
Olivet, SD 57052

DOH Public Health Laboratory
New Construction, Infrastructure - 60,000 SF
Sub-Bidding
$53,000,000 CJ est. value
Pierre, SD 57501

Sanitary Sewer Rehabilitation (Rebid)
Infrastructure
Post-Bid
$600,000 CJ est. value
Eureka, SD 57437

RFP D/B - Architectural and Engineering Services, Mineral Industries Building
New Construction, Infrastructure
Post-Bid
$34,000,000 CJ est. value
Rapid City, SD 57701

Brandon Core Area Reconstruction Phase 2
Infrastructure, Alteration
Results
Brandon, SD

Asphalt Surface Treatment
Infrastructure
Results
$2,281,045 CJ est. value
Olivet, SD 57052

Block 5 Project
New Construction, Infrastructure - 7,000 SF
Construction
$60,000,000 CJ est. value
Rapid City, SD 57701

Bond New Elementary School - Vermillion School District 13-1
Demolition, New Construction, Renovation, Infrastructure
Construction
$26,000,000 CJ est. value
Vermillion, SD 57069

WholeStone Farms Pork Harvesting And Processing Facility
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Sioux Falls, SD 57104

1st Avenue Mixed Use Development
New Construction, Infrastructure - 5,000 SF
Pending Verification
$28,000,000 CJ est. value
Sioux Falls, SD 57104

Interchange Reconstruction
Infrastructure
Conception
$50,978,000 CJ est. value
Sioux Falls, SD 57103

Last Updated 02/14/2024 12:11 PM
Project Title

Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Springfield, SD 57062   (Bon Homme County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 15, 2022, no bids received. No definite date for the rebid. Construction of an intake facility, treatment building and components related to a proposed water treatment plant. The Owner reserves the right to reject any or all bids and to waive any informalities in the bidding and make awards to the Owners best interest, MBE (1%), WBE (4%) Bid Schedule A: Construct a new intake facility with a building, concrete work, piping, valves, fittings, pumps, electrical work, site grading, bank stabilization and intake structure in the Missouri River. Construct a new water treatment plant with equipment that has been procured and will be assigned to the Contract. The plant building will be a pre-engineered steel building with concrete, finishes and related items. Multiple items will need to be removed and disposed of throughout the site to prepare for the construction area. Site grading with topsoil removal, replacement and hydraulically applied seeding/mulch, cut and fill, and sloping the surface is required. Reconstruction of the street adjacent to the plant is required along with a new gravel access road to the intake facility. The necessary piping, valves, fittings, connections and related items are to be furnished and installed to construct the process system. Site piping, manholes, valves, fittings and connections shall be furnished and installed throughout the project area for raw water supply to the plant, finished water supply to the distribution system, drain piping back to the river and other related items. A 120,000-gallon ground storage tank shall be furnished and installed with concrete floor and footings, pipe, drain tile system, insulation system and related items. The plant building construction includes plumbing with under-floor process piping, electrical work with automatic stand-by generator, HVAC system, and related items. The Work will be substantially complete on or before December 1, 2023;General Conditions within 30 days of the Date of Substantial Completion.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents