Similar Projects
Robert Henderson Road Self Storage
New Construction, Infrastructure - 18,625 SF
Conception
$2,000,000 CJ est. value
Sevierville, TN 37862

Brusters Ice Cream Parlor / Sevierville
New Construction, Infrastructure - 1,500 SF
Conception
$500,000 CJ est. value
Sevierville, TN 37876

Tomkins Farm Phase II
New Construction, Infrastructure
Design
$13,000,000 CJ est. value
Gallatin, TN 37066

Fox Creek
New Construction, Infrastructure
Design
$48,000,000 CJ est. value
Gallatin, TN 37066

Station Camp High School Field House
New Construction, Infrastructure
Bidding
$34,667 CJ est. value
Gallatin, TN 37066

RFQ D/B - Great Smoky Mountains National Park Project TN NP GRSM 11(5)
Demolition, New Construction, Infrastructure
Bidding
$35,000,000 CJ est. value
Gatlinburg, TN 37738

Demolish and Remove Gatlinburg Pittman High School Bleachers
Demolition
Post-Bid
$80,000 est. value
Gatlinburg, TN 37738

149368/149285 Rehabilitate GRSM Sugarlands at Great Smoky Mountain National Park
New Construction, Infrastructure, Renovation - 6,875 SF
Post-Bid
$10,000,000 CJ est. value
Gatlinburg, TN 37738

Fire Station 5 Site and Drainage Improvements
Infrastructure
Results
Gallatin, TN 37066

Southern Force Main (Hester To Sage) Project
Infrastructure
Results
$989,836 CJ est. value
White House, TN 37188

Dutch Bros / Sevierville
New Construction, Infrastructure - 950 SF
Construction
$500,000 CJ est. value
Sevierville, TN 37862

Cambria Hotel / Pigeon Forge
New Construction, Infrastructure
Construction
$27,000,000 CJ est. value
Pigeon Forge, TN 37863

HeartSong Lodge & Resort
New Construction
Pending Verification
Pigeon Forge, TN

Home 2 Suites
New Construction
Pending Verification
Sevierville, TN

Wilderness Resort Indoor Waterpark Expansion
Addition, Infrastructure
Conception
$1,000,000 CJ est. value
Sevierville, TN 37876

Last Updated 05/23/2023 11:20 AM
Project Title

Staybridge Hotel

Physical Address View project details and contacts
City, State (County) Gallatin, TN 37066   (Sumner County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $22,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 4 story, 71,876 square foot, 90 room hotel. As of May 23 2023, this project is in construction and the owner is the contractors . *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

4 Stories Above Grade, 71,876 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents