Similar Projects
HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Overlay and Chip Seal Lodgepole Road Kalispell Area
Alteration
Post-Bid

Overlay and Chip Seal Frontage Rd W of Columbus Billings Area
Infrastructure
Results

Scrub Seal Hwy 10 E Se of Greycliff Interchange Billings Area
Infrastructure
Results

Stillwater County Fair Grounds 03-1 Cast in Place Concrete and 31-1 Earthwork B
Infrastructure
Post-Bid
$300,000 CJ est. value
Columbus, MT 59019

Water Distribution System Improvements
Infrastructure
Results
Columbus, MT

Park City School Water Supply
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Park City, MT 59063

Jackson Creek Road Improvements
Term Contract
Results

Park City School - Pump System
New Construction, Infrastructure
Post-Bid
$50,000 CJ est. value
Park City, MT 59063

Mendenhall Ditch Rehabilitation Project
Infrastructure
Results
$191,500 CJ est. value
Absarokee, MT 59001

Nye Road Washout Rehabilitaion
Infrastructure
Post-Bid
$200,000 CJ est. value
Fishtail, MT 59028

Last Updated 03/16/2023 07:04 AM
Project Title

Hidden Lake Water & Sewer District Water System Improvements Project

Physical Address View project details and contacts
City, State (County) Columbus, MT 59019   (Stillwater County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,163,940 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Y19-00-103 Base Bid: The work generally consists of: Installation of 479 LF of 16" sewer main, jack and bore 174 LF of 30" steel casing, manholes, service reconnections, 84 LF of water main, fittings, and other associated pipe, asphalt surface restoration, traffic control, bypass sewage pumping, construction dewatering, and appurtenant work. Qualifications: Contractor(s) implementing trenchless technologies either by Horizontal Directional Drilling and/or Jack and Bore methods shall furnish written evidence of experience in performing said portion of work as requested in SECTION 00 41 00 BID FORMS. The contract may be awarded based on the OWNER's best interests. The award will be based on the lowest cost combination of responsive, responsible bids, on the Base Bid and various Schedules, Alternatives, and Additive Alternate, as applicable, selected by the OWNER. Contract Time: Base Bid: All construction schedules shall be substantially complete and ready for OWNER's use and pre-final inspection within 90 calendar days from the Notice to Proceed, or by Thursday, November 30, 2023, whichever is sooner. All construction schedules shall be finally complete and ready for final payment within (30) calendar days of Substantial Completion. Questions regarding the project will be addressed by the engineer and must be emailed to: Lowell Cutshaw at lowell.cutshaw@interstateeng.com or Eric Ler at eric.ler@interstateeng.com. Phone inquiries can be made to Lowell Cutshaw at 406-489-3410 or Eric Ler at 406-256-1920

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents