Similar Projects
Gravity Sewer System Condition Assessment and Renewal and Replacement (Inflow/Infiltration - I/I) Excavated Point Repairs
Post-Bid
Hollywood, FL 33022

Civil Work Related to Taft Street Force Main Condition Assessment
Post-Bid
Hollywood, FL 33022

Sanitary Sewer/ Storm Drain Maintenance and Repair
Term Contract
Results
Lauderdale-by-the-Sea, FL 33308

Sanitary Sewer Manhole Rehabilitation, Annual Contract
Term Contract
Results
Pompano Beach, FL 33060

Infiltration and Inflow Removal Phase 2A Lateral Repairs
Post-Bid
Hallandale, FL 33009

Mecca Force Main Extension Project
Results
Fort Lauderdale, FL 33301

Lyons Park Stormwater and Wastewater Improvements
Post-Bid
Pompano Beach, FL

Gravity Sewer System Condition Assessment and Renewal and Replacement (Inflow/Infiltration - I/I) Cured-In-Place Pipe (CIPP Lining)
Results
Hollywood, FL 33022

Sanitary Sewer Lateral Connection and Lateral Pipe Product
Post-Bid
Plantation, FL

Septic Tank Elimination Program
Results
Less than $1,700,000 est. value
Fort Lauderdale, FL 33301

Maintenance, Repair and Install of Plumbing Systems and Lift Stations-Along Florida's Turnpike System
Results

Water and Sewer Emergency Repair Services
Term Contract
Results
Miramar, FL 33025

Northwest 13th Street Phase I Force Main Replacement - Design Build P12388
Results
Less than $2,450,000 est. value
Fort Lauderdale, FL 33301

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Storm Sewer and Sewer Main Cleaning and Repairs
Term Contract
Results
Sunrise, FL 33351

Reported 04/14/2020 03:04 PM
Project Title

Belt Filter Press No. 1 and No. 2 Feed Pipe and Valve Replacement

Physical Address View project details and contacts
City, State (County) Miramar, FL 33025   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all material, equipment, labor, tools, machinery, incidentals and service necessary for the removal and disposal of approximately 64ft per unit of DIP Sludge piping for both Belt Filter Press No.1 and No.2. Contractor/Vendor will then be responsible for the installation of new 6” DIP piping along with new fittings, 6” chain wheel plug valves (same as existing) and flow meters. The two flow meters will be supplied by the City. This will be a turnkey project (except for wiring of new flow meters). Contractor/Vendor shall also be responsible for installation of all new supporting brackets/hardware, anchor rods and to be of 304/316 Stainless steel. As well as all nuts and bolts to be of 304/316 Stainless steel.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents