Similar Projects
Middletown Community Center - City of Middletown
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Middletown, OH 45044

Anderson Farm Residential Subdivision
New Construction, Infrastructure
Conception
$2,300,000 CJ est. value
West Chester, OH 45069

Pump Station Construction
New Construction
Design
$1,500,000 est. value
Middletown, OH

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

2023 Curb and Gutter Replacement Program
Infrastructure
Bidding
$140,000 CJ est. value
Fairfield, OH 45014

RFQ D/B - Dry Fork Streambank Stabilization
Infrastructure
Bidding
$488,938 CJ est. value
Hamilton, OH 45011

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

South Union Road Roadway Improvements and Water Main Extension Project
Infrastructure
Post-Bid
Middletown, Monroe, OH 45044

Moore Road Water Main Replacement
Results
$803,580 est. value
Middletown, OH

Advanced Metering Infrastructure (AMI) and Water Meters
Infrastructure
Results
Less than $150,000 est. value
Fairfield, OH

Towne Mall Galleria / Middletown Multi-Purpose Entertainment Venue
Demolition, New Construction, Infrastructure - 492,200 SF
Pending Verification
$280,000,000 CJ est. value
Middletown, OH 45005

Freddy's Frozen Custard & Steakburgers / Fairfield
New Construction, Infrastructure - 3,000 SF
Pending Verification
$900,000 CJ est. value
Fairfield, OH 45014

SR 126 Resurfacing, Undivided System
Infrastructure
Design
$2,800,315 CJ est. value
Hamilton, OH 45013

Bridge Repair
Infrastructure
Bidding
$625,820 CJ est. value
New Miami, OH 45011

CDBG and OPWC Water System Improvements, Phase 2 Project
Infrastructure
Post-Bid
$207,350 est. value
New Miami, OH

Last Updated 09/21/2022 12:34 PM
Project Title

14th Avenue Overflow Pipe Rehabilitation

Physical Address View project details and contacts
City, State (County) Middletown, OH 45044   (Butler County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The requested services include full length rehabilitation of approximately 367 LF of 78”x96” concrete pipe. A sewer inspection found that there was a large circumferential crack near the 14th Avenue Overflow that resulted in an above ground sink hole near the Great Miami River. Additional horizontal cracks were observed through the length of the pipe as well as severe corrosion. The pipe shall be rehabbed using a cementitious liner. The project completion date will be determined after council approves contract award. No bid will be allowed to be withdrawn after it has been deposited with Public Works & Utilities. Proposals shall be accompanied by a bid guaranty bond in the amount of 10% of the bid or a certified check, cashiers check, or letter of credit in the amount of 10% of the bid. The successful bidder will be required to execute the contract and to provide a 100% performance bond within ten (10) days after the award of the contract. In case the bidder neglects to so execute the contract, the check accompanying the proposal shall be forfeited to the City of Middletown, not as a penalty, but as liquidated damages. The address and telephone number of the bonding company and agent must be included with all bid guaranty bonds and performance bonds. If applicable, bidders must comply with the State Prevailing Wage Rates on Public Improvements in Butler County and the City of Middletown, Ohio as determined by the Ohio Auditor of State Division of Industrial Compliance & Labor. Prior to submitting a proposal, contractors must certify that they have met the requirements of the Ohio Bureau of Workers Compensation's (BWC) Drug Free Workplace Program to be eligible for state funded construction projects including grants within ten days of the bid award. The bid will be deemed non- responsive and not eligible for the award of contracts if this certification is not met. The right to reject any oral bids is reserved by the City of Middletown. Informalities may be waived at the option of the City Council.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents