Similar Projects
Costco / Guilderland
New Construction, Infrastructure - 158,202 SF
Conception
$20,000,000 CJ est. value
Albany, NY 12203

All One One All - A D'Artagnan Farm
Renovation, Infrastructure
Conception
$400,000 CJ est. value
Goshen, NY 10924

Big Ditch Brewing Co
New Construction - 105,000 SF
Design
Cheektowaga, NY 14221

AutoZone #4716 / Jamaica
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
New York, NY 11433

The Installation of Scaffolding and Heavy Duty Sidewalk Bridge
Infrastructure
Bidding
$310,000 CJ est. value
New York, NY 10007

Reconstruction of 5th Avenue Bridge over LIRR and Sea Beach
Infrastructure
Bidding
$900,000 CJ est. value
New York, NY 11216

Harrington Heights - Site Development
New Construction
Post-Bid
Poughkeepsie, NY 12601

Village Municipal Building and Barker Pubic Library Basement Package
Infrastructure
Post-Bid
Barker, NY 14012

Fencing and Other Site Improvements at Hilltop Hanover Farm
Infrastructure, Alteration
Results
$200,000 to $250,000 est. value
Yorktown Heights, NY 10598

Mainline Track Replacement
Infrastructure
Results
$131,719,500 CJ est. value
New York, NY 11366

Hatfield Metal Fab Expansion
Addition - 30,000 SF
Construction
Poughkeepsie, NY 12603

Fulton Street Mixed Use
New Construction, Infrastructure - 130,000 SF
Construction
$50,000,000 CJ est. value
New York, NY 11238

South Pearl Street Group Living Shelter Addition
Addition, Demolition, Infrastructure - 30,972 SF
Pending Verification
$5,000,000 CJ est. value
Albany, NY 12202

Viridi Parente Expansion
Addition - 70,000 SF
Pending Verification
Buffalo, NY 14215

River Road Rehabilitation -3269- Rockland County
Infrastructure
Conception
$11,700,000 est. value
Stony Point, NY 10980

Last Updated 08/22/2022 11:01 AM
Project Title

Forge Avenue Industrial Building

Physical Address View project details and contacts
City, State (County) Geneva, NY 14456   (Ontario County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 22, 2022, this project has gone before the Geneva Planning Board for an informal review. Although there is not a firm timeline, construction could begin in first quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents