Similar Projects
Culverts
Post-Bid
TX

Linda Lane Waterline, Driveway and Culvert Improvements
Results
Bryan, TX

Rock Prairie Management District No 2 - Midtown Reserve Subdivision Phase 100
Results
College Station, TX 77840

Parking, Grading, and Drainage Improvements
Post-Bid
Bryan, TX 77801

Jane Long Intermediate School Detention Pond
Results
Less than $40,000 est. value
Bryan, TX 77803

Installation of Driveway Pipe
Results
Less than $608,560 est. value
TX

EDC Building Grading and Drainage Improvements
Results
Bryan, TX 77803

Waco Street Extension
Results
Less than $1,675,159 est. value
Bryan, TX

Construction of Water, Drainage, and Paving Facilities for Millican Reserve Meadows Phase III
Results
College Station, TX

Woodville Road - Street, Drainage and Utility Improvements
Results
Less than $4,472,225 est. value
Bryan, TX 77803

Coulter Drive Reconstruction and Drainage Improvements
Results
Less than $4,641,000 est. value
Bryan, TX 77803

Sheep Feeding Expansion Building
Post-Bid
College Station, TX 77845

Clearing, Grubbing and Mass Grading No. 1 for Southern Pointe
Results
College Station, TX 77840

State Highway 6 Entrance Paving and Drainage Facilities
Results
TX

Rye Loop Road Culvert Reconstruction
Bidding
Bryan, TX 77803

Last Updated 12/27/2018 02:51 PM
Project Title

Cherry Creek Circle Drainage Improvements

Physical Address View project details and contacts
City, State (County) Bryan, TX   (Brazos County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project involves the regrading and lining of approximately 325 linear feet of Briar Creek, including: 1. Articulating concrete block revetment (Base Bid); or Sloped concrete revetment (Alternate Bid); 2. Clearing and grubbing existing vegetation; 3. Relocation and setting of ~300 CY of broken concrete rip rap; 4. Removal and replacement of ~1500 SF of concrete drive; 5. Dewatering plan and implementation; and 6. Tree protection and erosion control measures.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents