Similar Projects
Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

Metro Center - Parcel A
New Construction
Design
Aurora, CO 80012

I-70 Picadilly Design Build
Infrastructure
Bidding
Aurora, CO 80040

Scour Mitigation for Two Twin Structures
Infrastructure
Bidding
$5,000,000 CJ est. value
Aurora, CO 80019

Asphalt Repair FCI Englewood
Term Contract
Post-Bid
Littleton, CO

2021 Roadway Improvements Project
Infrastructure
Post-Bid
Bow Mar, CO

On-Site Improvements
Results
Greenwood Village, CO 80111

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

Centennial Medical Plaza
New Construction, Renovation, Infrastructure - 61,000 SF
Pending Verification
$7,000,000 CJ est. value
Centennial, CO 80112

Metro Center - Parcel B
New Construction
Design
Aurora, CO 80017

Chambers Road Over Sand Creek Bridge Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Aurora, CO 80011

Construction Debris, Solid Waste
Infrastructure
Post-Bid
Littleton, CO

Greenwood Gulch Undercrossing
Results
$250,000 to $350,000 est. value
Centennial, CO 80111

Windler Mixed-Use Development / Aurora
New Construction, Infrastructure
Pending Verification
$287,000,000 CJ est. value
Aurora, CO 80011

Last Updated 08/18/2022 07:02 AM
Project Title

Altura Blvd. Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Aurora, CO 80011   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $182,400 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Altura Blvd. Sidewalk Improvements project consists of constructing an ADA compliant 5' wide sidewalk on the west side of Altura Boulevard to provide improved pedestrian facilities and an improved crossing with Rectangular Rapid Flashing Beacons (RRFB) at the intersection of Altura Boulevard and E 17th Avenue. The estimated cost for this project is from $205,000.00 to $280,000.00 Construction consists of the following improvements: Earthwork - Unclassified excavation Removals - Existing mid-block crossing, asphalt pavement, curb ramps Upgrading existing curb ramps Concrete Work - 5' wide sidewalk, curb and gutter, curb ramps Hot mix asphalt patching Installation of two RRFBs Reset water meter Reset mailbox structures and ground signs Tree removal Mobilization, Landscape restoration, Construction traffic control Erosion control BMPs Work not specifically called for, but which must be accomplished to construct the widening required under this contract, shall be considered as a part of this contract, whether or not specifically detailed. Buyers Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Question Acceptance Deadline 07/19/2022 05:00 PM EDT Questions are submitted online No

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents