Similar Projects
Region 4 Administrative Facility
New Construction, Infrastructure - 5,000 SF
Bidding
$2,240,000 CJ est. value
Hattiesburg, MS 39401

Multipurpose Range Complex (MPRC) Erosion Repairs Camp Shelby Joint Forces Training Center
Renovation
Bidding
$200,000 CJ est. value
Hattiesburg, MS 39401

Hardy Street Roundabout Project at 2nd Avenue/Green Street/Adeline Street
Post-Bid
$1,400,000 to $1,500,000 est. value
Hattiesburg, MS 39407

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Design-Build and Design-Bid-Build Indefinite-Delivery Indefinite-Quantity Multiple Award Construction Contract for Naval Facilities Engineering Command Southeast Area of Operations N69450-20-R-0097
Results
$20,000,000 to $100,000,000 est. value

Quinn Street Speed Table and Sidewalk Project
Results
$100,000 to $125,000 est. value
Hattiesburg, MS 39401

2021 Additions and Renovations Dixie Attendance Center
Addition, Demolition, Renovation, Infrastructure
Bidding
$1,670,000 CJ est. value
Hattiesburg, MS 39401

Hardy Street Landscape and Crosswalk Improvements
Post-Bid
$625,000 est. value
Hattiesburg, MS 39407

Chip Seal and Fog Seal Approximately 52 miles on Various Routes Throughout the District 6
Results

Repair Laker Walker Dam Camp Shelby Joint Forces Training Center
Infrastructure
Bidding
$90,000 CJ est. value
Hattiesburg, MS 39401

Forrest County Overlay
Infrastructure
Post-Bid
MS

Country Club Road Reconstruction
Infrastructure
Results
$1,947,200 est. value
Hattiesburg, MS

Construct Range Operations and Control Area (ROCA) Facilities Range 48A
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Camp Shelby, MS 39401

RTI Track Widening and Overlay
Infrastructure
Post-Bid
Camp Shelby, MS

Mill and Overlay approximately 1 mile on US 11 from Bouie Street to the Leaf River Bridge and Level and Overlay approximately 2 miles on SR 42 from the end of the 4-lane Section to the Perry County Line
Infrastructure
Results
MS

Last Updated 09/08/2022 10:10 AM
Project Title

RFQ D/B - Equipment Concentration Site

Physical Address View project details and contacts
City, State (County) Camp Shelby, MS 39401   (Forrest County)
Category(s) Commercial, Government/Public, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Gas Station, Industrial Warehouse, Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference is made to your IDIQ Design Build and Design Bid Build, Firm Fixed Price Multiple Award Task Order Contracts (MATOCs) Numbers W912QR21D0049 thru W912QR21D0055 to support the military construction (MILCON) and operations and maintenance (O&M) funded construction requirements for the U.S. Army Reserves, U.S. Air Force Reserves, U.S. Air Force and U.S. Army programs in the Southeast Region. We request you submit a proposal for the construction of a VMS, 2 Storage Buildings; Administrative Building; and Military Equipment Parking (MEP) located at Camp Shelby, Mississippi, as detailed in the scope of work, drawings, and specifications posted on www.Sam.gov. The documents are available for download on the beta.Sam.gov website only. All vendors must be registered in the SAM database. The RFP can be found by logging into the website as a vendor and searching on the solicitation number W912QR-22022283. The cost range is between $10,000,000 and $25,000,000. PLEASE NOTE: This is for Design Build construction services only. The basis for award of this task order is lowest evaluated price. Please complete the price breakout schedule and include a labor category table demonstrating the use of the binding rates included in your MATOC contract. The submitted price breakdown should include sufficient detail to allow the Government to verify that your proposed price incorporates the binding rates from your base contract. Any level of effort shown in the submitted information will not be used for evaluation purposes and will be used only to ensure that the proposal is in compliance with the binding rates from the base contract. Offerors shall allow for Government acceptance of proposals for 45 calendar days from the date proposals are due. Any proposal that does not allow acceptance for 45 days will not be considered and will be rejected. Proposals are due no later than 2:00 PM Eastern Time on 13 September 2022. Submit your proposal by email to Levi Speth at Levi.R.Speth@usace.army.mil. Proposals not received by the stated date/time will not be considered. Please acknowledge receipt of this RFP by signing below in the space provided and returning to Levi Speth via email. Note: Bonding and Insurance is required for this Task Order. See FAR 52.228-2, FAR 52.228-5, FAR 52.228-14, and FAR 52.228-15 located within section 00700 of your Base IDIQ Contract (W912QR21D0049 through W912QR21D0055). If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the Offeror shall immediately notify the Contract Specialist, Levi Speth at Levi.R.Speth@usace.army.mil in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion. If you have contractual questions, please contact Levi Speth at Levi.R.Speth@usace.army.mil. Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation. To submit and review bid inquiry items, bidders will need to be a current registered user or self- register into system. The Solicitation Number is: W912QR-22022283 The Bidder Inquiry Key is: I797ST-6I433C *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

,, 52,900 SF - 34,200 SF. 4,500 SF. 14,200 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents