Similar Projects
Intersection Improvements - CSAH 13 - CP 0013-369675
Infrastructure
Conception
$2,200,000 est. value
Muskogee, OK 74401

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Industrial Access Road Extension Smith Ferry Road and South 24th Street John T. Griffin Industrial Park
Infrastructure
Bidding
$400,000 est. value
Fort Gibson, OK

Section A Waterline and Section B Stand Pipe Painting and Rehabilitation
Infrastructure
Post-Bid
Taft, OK

Construction of Section A and B
Infrastructure
Post-Bid
Taft, OK

Resurface (Asphalt)
Results

Resurface (Asphalt)
Results
Muskogee, Wagoner, OK

Relocation of 570 LF of 4" and 2" PVC Water Main and 295 LF 4" Bore and Casing and 115 LF 8" Bore and Casing
Infrastructure
Post-Bid
Webbers Falls, OK

Widen, Resurface, and Bridge Rehabilitation
New Construction
Results

Furnish and Install a Water Service Line
Term Contract
Post-Bid
Muskogee, OK 74401

Resurface
Results
Wagoner, OK 74467

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Fort Gibson Learning Trail
Infrastructure
Results
Fort Gibson, OK

Muskogee Port Access Road Extension
Infrastructure
Post-Bid
$340,000 est. value
OK

Reported 07/15/2022 12:00 AM
Project Title

Wash Pad Improvements - Three Forks Harbor

Physical Address View project details and contacts
City, State (County) Fort Gibson, OK 74434   (Muskogee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $515,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of a concrete wash pad, storm sewer, concrete curb and gutter, aggregate base, light poles, water service line, and all appurtenances. Bidders must bid on all items of the contract. The whole work under this contract will be awarded as a single contract to the lowest responsible bidder for the work. The work shall consist of a concrete wash pad, storm sewer, concrete curb and gutter, aggregate base, light poles, water service line, and all appurtenances.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents