Similar Projects
Last Updated | 12/29/2021 12:15 PM |
Project Title | Roadway and Bridge Reconstruction from Milepost A-37.39 to Milepost A-43.33 in Montgomery and Bucks Counties |
Physical Address | View project details and contacts |
City, State (County) | (Bucks, Montgomery Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project provides for the milling and asphalt overlay of the Pennsylvania Turnpike mainline from Milepost 345.73 to Milepost 353.47. The project involves replacing the wearing and binder courses of the existing travel lanes, bridge deck repair, and replacing the wearing course over Bridge No. DB-220, DB-222, and DB-223. Work also includes maintenance and protection of traffic. Work items include, but are not limited to: 32,263 TON Superpave Asphalt Mixture Design, Wearing 17,174 TON Superpave Asphalt Mixture Design, Binder 197,100 SY Milling of Asphalt Pavement, 1 ½” Depth 48,800 SY Milling of Asphalt Pavement, 2” Depth 118,480 SY Milling of Asphalt Pavement, 4” Depth 916 LF Concrete Glare Screen with Drainage Slot Either: 100,800 GAL Asphalt Or: 88,200 LB Polyurethane 127,324 LF 6” White Highly Reflectorized Polyurea Pavement Markings 83,800 LF 6” Yellow Highly Reflectorized Polyurea Pavement Markings 1,250 SF Concrete Bridge Deck Repair – Type 2 1,959 LF Asphaltic Plug Expansion Joint System |
||||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |