Similar Projects
Residential Shelter
New Construction, Renovation - 8,836 SF
Conception
Max Meadows, VA 24360

Dorey Park Recreation Center Splash Pad
New Construction
Bidding
VA 23231

Hand-In-Hand Playground Project
Post-Bid
$850,000 est. value
Blacksburg, VA

High School Running Track Resurfacing Project
Post-Bid
Portsmouth, VA

Upton Hill Regional Park - Site Renovations and Parking Expansion
Results
$850,000 est. value
Arlington, VA 22205

Summit View Athletic Field
Results
Rocky Mount, VA 24151

Preston Lake Luxury Apartments
New Construction
Construction
Harrisonburg, VA

The Waypoint at Fairlington
New Construction, Renovation - 137,212 SF
Construction
$10,000,000 est. value
Alexandria, VA 22302

Multi-Use Sports Complex
Post-Bid
Abingdon, VA

Track Refurbishment at Atlee High School
Results
Mechanicsville, VA 23116

Jennie Dean Park Phase 1 Renovations
Construction
$13,842,000 est. value
Arlington, VA 22201

Randolph Park Dugouts for Baseball/Softball Complex
Post-Bid
Pulaski, VA 24084

Construction of the Potomac Green Neighborhood Park Improvements
Results
Ashburn, VA 20147

Petersburg Park and Ride Parking Structure
New Construction - 68,564 SF
Construction
$7,000,000 to $9,000,000 est. value
Petersburg, VA 23803

Engineered Wood Fiber Playground Surface Material, Purchase and Installation
Term Contract
Post-Bid
Arlington, VA

Last Updated 08/31/2021 01:02 PM
Project Title

Widewater State Park - Complete Phase 1 Development

Physical Address View project details and contacts
City, State (County) Stafford, VA 22554   (Stafford County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as construction of approximately 0.5 miles of road, a boat ramp on the Potomac River, dredging of channel, shoreline stabilization, tending piers and fishing station, parking, multiple buildings, playground, widening of Brent Point Road, well based water supply and treatment system, and on-site septic system, all on a wooded site.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 13 - Special Construction.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents