Similar Projects
Basketball Court, ADA Ramps, Fencing, Shade Structure, and Concrete Pad
Renovation, Alteration
Bidding
$130,000 est. value
Concord, MA

Reconstruction and Renovation of the Liberty Field Playground
Renovation
Bidding
$1,200,000 est. value
Boxborough, MA 01719

Gerow Recreation Area Phase 1 Park Improvements
Post-Bid
$1,100,000 est. value
Concord, MA

Rahanis Park - Tennis Court Resurfacing
Post-Bid
Burlington, MA 01803

Tennis Court Replacement at War Memorial Recreation Center
Results
$435,000 est. value
Cambridge, MA 02138

Universal Design Playground
Results
Less than $4,950,000 est. value
Cambridge, MA 02139

Green at UTEC
New Construction
Construction
Lowell, MA 01852

Surface Rehabilitation of Four Baseball/Softball Infields at the Concord-Carlisle Regional High School
Post-Bid
$100,000 est. value
Concord, MA 01742

Parks and Playgrounds Maintenance and Repair Services
Results
Less than $65,000 est. value
Cambridge, MA 02139

Tennis Court Reconstruction at Shawsheen Elementary School
Infrastructure
Post-Bid
$325,000 est. value
Wilmington, MA 01887

Thompson and MacDonald Playgrounds Renovation
Results
Waltham, MA 02453

Repair and Resurface Existing Track
New Construction
Post-Bid
Ashland, MA

Hovey Park Project
Results
$600,000 est. value
Lowell, MA 01850

Lincoln-Sudbury Turf Replacement
Infrastructure
Post-Bid
$200,000 est. value
Sudbury, MA 01776

Hill's Hill Playground ADA Walkway
Results
Less than $65,000 est. value
Arlington, MA 02474

Last Updated 05/25/2022 11:52 AM
Project Title

Leary Field Renovation Project, 2022

Physical Address View project details and contacts
City, State (County) Waltham, MA 02451   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. Install an impermeable polyurethane synthetic track system comprised of a base layer of polyurethane bound SBR rubber granules, BEYPUR 200, an impermeable layer (seal coat) of a two-component urethane, and topped with BEYPUR, a spray-applied coating of single-component polyurethane, and EPDM granules. B. Layout and paint all track lines and event markings as required and specified by current IAAF and NCAA rules.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents