Similar Projects
Site Work and Construction of Hager Pedestrian Bridge
New Construction
Bidding
Less than $70,000 est. value
Boxborough, MA

Scheduled and Emergency Drawbridge Operation, Maintenance and Repairs at Various Locations
Post-Bid
Less than $5,090,000 est. value

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

The Northern Strand - A Gateway City Parks Program
Results
Less than $13,100,000 est. value
Everett, Lynn, Malden, Revere, Saugus, MA

Bridge Replacement (Belden G. Bly) BR. No. L-18-016=S-05-008 (Bascule) Route 107 (Salem Turnpike/Western Avenue) over the Saugus River
Results
Less than $84,038,000 est. value
Lynn, Saugus, MA 01901

Scheduled and Emergency Bridge Structural and Substructure Repairs and Related Work at Various Locations (Excluding I-90 Bridges)
Results
Less than $2,350,000 est. value

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Results
Less than $5,075,117 est. value

Bridge Deck, Joint and Substructure Repairs and Related Work on 4 Bridges BR Nos B-16-216, N-12-013, N-12-019 and W-29-017
Results
Less than $3,101,104 est. value

Lockwood Lane Bridge Replacement
Results
Less than $1,100,000 est. value
Boxford, MA 01921

Bridge Drainage and Improvements at Various Locations
Results
Less than $3,492,555 est. value

Bridge Cleaning and Related Work at Various Locations
Results
Less than $388,375 est. value

Scheduled and Emergency Drawbridge Operation, Maintenance, and Repairs at Various Locations
Results
Less than $5,089,750 est. value

Scheduled and Emergency Bridge Structural and Substructure Repairs and Related Work at Various Locations
Results
Less than $2,030,330 est. value

Scheduled and Emergency Bridge Structure and Substructure Repairs and Related Work at Various Locations on Interstate 90
Results
Less than $1,907,420 est. value

Scheduled and Emergency Bridge Structural and Substructure Repairs at Various Locations
New Construction
Results
$3,254,217 est. value

Last Updated 05/13/2021 09:26 AM
Project Title

Concord Street Bridge Over Walker Creek Replacement

Physical Address View project details and contacts
City, State (County) Gloucester, MA 01930   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Concord St. Bridge over Walker Creek replacement includes, but is not limited to, demolition of existing and construction of new bridge, guardrail proposed wingwall, pavement reconstruction, etc.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents