Similar Projects
Village of St. Peter Water Tower Painting
Renovation
Bidding
$600,000 CJ est. value
Saint Peter, IL 62880

North Main Manor and Olesen Plaza - Paint Project Rebid
Renovation
Sub-Bidding
$80,000 CJ est. value
Rockford, IL 61101

Seal Coat Re-surfacing
Infrastructure
Post-Bid
$400,000 CJ est. value
Sidney, IL 61877

Meadowhill Aquatic Center Pool Slide Gelcoat and Painting
Alteration
Post-Bid
Northbrook, IL 60062

2021 Painting
Results
Urbana, IL

McCoy Street Pedestrian Bridge Repairs
Renovation
Results
Aurora, IL

Fire Hydrant Painting
Alteration
Post-Bid
Saint Charles, IL

Water Tower 4 Rehabilitation
Alteration
Results
Cary, IL 60013

Day Labor General Contractor Maintenance and Repair
Term Contract
Post-Bid
Springfield, IL 62702

RLCD Elevated Water Tank Repainting or Demolition
Infrastructure, Alteration
Results
Waltonville, IL 62894

Preparing and Painting MDH MALSR Fiberglass LIR Poles And Support Towers
Alteration
Post-Bid
$20,000 to $42,000 est. value
Carbondale, IL

Cosley Zoo Siding and Exterior Painting
Infrastructure, Alteration
Results
Wheaton, IL 60187

2022 Moline Police Department Interior Painting
Renovation, Alteration
Post-Bid
Moline, IL 61265

Painting 500,000 Gallon Centennial Drive Water Tower
Alteration
Results
East Peoria, IL

Pool Apparatus Painting, Shell Painting and Caulking
Alteration
Post-Bid
Northbrook, IL 60062

Last Updated 06/28/2023 09:38 AM
Project Title

Centralia HS Maintenance Grant Painting 2023

Physical Address View project details and contacts
City, State (County) Centralia, IL 62801   (Marion County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $129,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of painting existing gypsum board walls, CMU walls, hollow metal doors and frames, gypsum ceilings. Bid Security isrequired in the amount of Ten percent (10%) of Proposal, made payable unconditionally to the Owner. Security shall be certified check, cashier's check or bid bond issued by surety licensed to conduct business in the State of Illinois. Within ten (10) days after notification of award of contract, the successful Contractor shall furnish a Performance Bond and Payment Bond in the amount of 100 percent of the contract and the payment of all obligations arising thereunder using a form similar to the AIA(R) 312 Form, or one acceptable to Owner. The Performance Bond will become a part of the Contract. The failure of the successful bidder to enter into contract and supply the required bond and Certificates of Insurance within ten (10) days after the prescribed forms are presented for signature, or within such extended period as the Owner may grant, shall constitute a default. The Owner reservesthe right to accept or reject any or all bids, to waive any informalities and irregularitiesin any bid, or to make awards in the best interests of the Owner.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents