Similar Projects
James E Quarles WTP Valve and Actuator Replacement
Alteration
Bidding
Marietta, GA 30067

New Replacement Boiler and Proper Regulation and Management for the Existing Steam Distribution
Alteration
Bidding
Toccoa, GA 30577

Walk In Cooler and Freezer
Post-Bid
Milledgeville, GA 31061

Ellijay Elementary Walk-In Cooler
Post-Bid
Ellijay, GA 30540

Petit Science Center Boiler 2 Burner Retrofit
Results
Atlanta, GA 30303

Submersible Pump
Results
Rome, GA 30162

Boiler Replacement at Melton Hall
Alteration
Bidding
$400,000 est. value
Barnesville, GA 30204

HVAC and Mechanical Maintenance Service
Term Contract
Post-Bid
Cartersville, GA

Myers Middle School Boiler and Pumps Replacement
Results
Savannah, GA 31404

Water Cooler and Fountain Replacement
Alteration
Bidding
Atlanta, GA 30310

Replace Boiler and Cooling Tower at Douglass High School
Post-Bid
Atlanta, GA 30318

Boiler Replacement at Hightower Library
Results
$95,000 to $150,000 est. value
Barnesville, GA 30204

Townsend Chiller Replacement
Alteration
Bidding
Carrollton, GA 30118

Replacement Walk In Cooler and Freezer for Callaway High School
Post-Bid
Hogansville, GA 30230

Administrative Center Mechanical and Roof Improvements
Results
Atlanta, GA 30339

Reported 04/12/2022 12:00 AM
Project Title

York Chiller for Brown Center

Physical Address View project details and contacts
City, State (County) Dalton, GA 30720   (Whitfield County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The project includes qualified contractor to provide all labor, tools, and equipment for the demo and installation of a new 75 ton air cooled chiller in Brown Hall. The contractor will need to provide line voltage wiring per code, and start-up and commissioning of the new chiller unit. The contractor will also be responsible for connecting and commissioning BACNet card with current ALC controls. The new air cooled chiller will need to meet and include the following specs: BACNet Card; Low Ambient Kit; Steel Water Piping with 1.5" Insulation, Supports per Code, and Metal Jacket on Insulation: P-T Ports on Water Piping: Rental Chiller Taps Installed - Must Have Valves Installed on Both Sides of the "T"; Minimum 4" off Existing Chiller Pad with Rubber Isolation Between Supports and Chiller Rails: Written Factory Warranty; Temperature and Liquid Filled Pressure Gauges; Phase Loss Monitor; 120 VAC Power Outlet in Control Panel; Inlet Strainer; Heat DisperNion Flow Sensor: Recovered R-22 Left on Jobsite.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents