Similar Projects
Last Updated | 08/19/2022 03:02 AM |
Project Title | Trestle Drain Repair |
Physical Address | View project details and contacts |
City, State (County) | Saint Louis, MO 63103 (Saint Louis City County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $7,500 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Great Rivers Greenway District (the District), is a multi-jurisdictional political subdivision including the City of St. Louis, St. Louis County and St. Charles County. The primary purpose of the District is to improve the quality of life throughout the St. Louis region by developing a public system of interconnected greenways, trails and parks. The District is seeking bids for installation of new piping to existing bridge deck drain in St. Louis, MO. Questions regarding this bid are to be sent via email no later than July 21, 2022 at 5:00 p.m. prevailing central time to Ben Grossman, Director of Greenway Operations at bgrossman@grgstl.org. Responses shall be issued no later than July 25, 2022 to all known plan holders who provided information when downloading the bid packet from the District website. It is the policy of the District that minority and women-owned businesses shall have the maximum opportunity to participate in the performances of contracts utilizing District funds. While not a requirement, the District has established Minority and Women Business Enterprise goals of 25/5% i.e. 25% of the total contract amount to be awarded to Minority Business Enterprises (MBE) and 5% of the total contract amount to be awarded to Women Business Enterprise (WBE). It is the prospective firms responsibility to make a sufficient portion of the work available to sub-contractors to meet the goal, consistent with the availability and capacities of MBE and WBE firms. MBE/WBE firms, if included in the submittal, either as general contractor or sub-contractors, must be certified by one or more of the follow agencies on or before the date of the submission of qualifications: Missouri Division of Purchasing and Materials Management City of St. Louis: Disadvantage Business Enterprise Program St. Louis Minority Business Council Contractor to provide all labor, materials, equipment and permits necessary to install a new drainpipe to existing bridge (Trestle) deck drain and route drain to allow water to spill onto existing grade. Drainpipe to be adequately secured to the structure. Previous deck drain was removed, therefore no demolition or removal required. New drain to be installed to existing stub out on the underside of the deck. Drain is located in the Old North St. Louis Neighborhood at the intersection of 11 th Street and Tyler Street, St. Louis, MO 63106. All work to comply with City of St. Louis Building Department requirements for plumbing work. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |