Similar Projects
SR 400 Phase 1 DB Project
Infrastructure
Bidding
GA

Special Inspection and Construction Material Testing
Alteration
Bidding
GA

Fire Extinguisher and Jail Hood System Inspection
Term Contract
Post-Bid
Blackshear, GA

Registered Roof Observation at the Juvenile Justice Center
Post-Bid
Cumming, GA

Archaeological Surveys/Firebreaks Tuckahoe
Post-Bid
Atlanta, GA

Survey and Wetland Delineation
Post-Bid
Ashburn, GA 31714

HUD Nationwide Construction Inspection Services
Term Contract
Post-Bid
Less than $50,000,000 est. value

Well Inspection/Cleaning, #1,16, And 17
Term Contract
Post-Bid
Warner Robins, GA 31098

Cylinder Replacement Survey
Alteration
Post-Bid
Albany, GA 31701

MEI Services for State Maintenance Office
Term Contract, Infrastructure
Post-Bid
Atlanta, GA

Generator Maintenance and Repair
Term Contract
Post-Bid
Brunswick, GA 31525

Building Department Services and Erosion Control Review and Inspections
Term Contract
Post-Bid
Peachtree City, GA

Indefinite Delivery Indefinite Quantity - Construction Materials Testing Services
Term Contract
Post-Bid
Atlanta, GA

Dams Inspections - Annual Contract
Term Contract
Post-Bid
GA

Last Updated 04/06/2022 01:07 PM
Project Title

Tank Inspection - Fort Benning Georgia

Physical Address View project details and contacts
City, State (County) Fort Benning, GA 31905   (Chattahoochee County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The tank Inspection shall be in conformance with applicable industry standards API 653, NFPA 30, NFPA 326, UFGS 33 01 50.60, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements. At a minimum, table 8-1 within UFC 3-460-01 shall be followed. All tank appurtenances that are required shall be documented along with all required appurtenances that aren’t present. Alarms, Automatic Tank Gauge equipment, and all tank appurtenances shall be tested and verified. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection. If UT is required per Attachment B, coverage of the UT scan shall include 5 points per shell plate on the first shell course. Spot UT scans shall be made once every foot along the circumference of the tank shell within the critical zone and along the tank chime as accessible. 5 points per shell plate should also be taken along the spiral staircase for each shell course as accessible. Provide UT scans of tank shell nozzles on the first shell course and their respective reinforcements plates as applicable. Include all findings in the inspection report.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents